Similar Projects
Repair Permanent Party Barracks A2451 & A3351
Renovation
Post-Bid
Fort Bragg, NC 28310

Construction of Dorm 1 and 2 Remodel
Post-Bid
Black Mountain, NC 28711

Renovation of the WSSU Rams Commons Residence Hall
Renovation
Construction
Winston-Salem, NC

Alpha Phi Sorority House
Renovation, Addition - 7,770 SF
Construction
$3,100,000 est. value
Chapel Hill, NC 27514

Smith Hall
Renovation - 2,730 SF
Construction
Elon, NC 27244

Western Carolina University Lower Campus Residence Hall
New Construction - 224,000 SF
Post-Bid
Cullowhee, NC

Elon University - Carolina Hall Renovations
Renovation
Post-Bid
Elon, NC 27244

Blue Line Aviation
New Construction
Pending Verification
Smithfield, NC

St. Luke Catholic Church - Phase 1A Sitework, Recreation Shelter and Rectory
New Construction - 3,884 SF
Construction
$1,500,000 est. value
Charlotte, NC 28277

H2A Housing
New Construction
Design
Huntersville, NC 28078

Vue On University
New Construction
Construction
$50,000,000 est. value
Charlotte, NC 28262

Bryant Hall and Vance Hall - Asbestos Abatement, Demo, and Site Restoration
Demolition - 96,680 SF
Post-Bid
Fayetteville, NC 28301

Residence Hall Phase 16
New Construction, Renovation - 147,000 SF
Results
$40,000,000 to $52,000,000 est. value
Charlotte, NC

Last Updated 01/06/2022 02:59 PM
Project Title

C.A. Dillon Youth Development Center Renovations - Phase B

Physical Address View project details and contacts
City, State (County) Butner, NC 27509   (Granville County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method
Project Status Construction Commenced March 2021, Construction Completion Expected April 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations to campus dormitory cottages A, & B, that include but are not limited to: cleaning patching & painting selected surfaces, hard metal security ceilings & full height utility chase doors at sleeping room corridors, renovation of an accessible student room, replace selected plumbing fixtures, ICON remote flushing system, domestic hot water heaters, DDC controls for HVAC system, electrical service & distribution, change lighting to LED, electric devices & equipment connections, fire alarm & detection, data & telecommunication, emergency generators. Renovations to school classroom side of Building C (not vocational building wing) includes but is not limited to: cleaning patching & painting selected surfaces, replace damaged corridor & classroom VCT as indicated, replace Gym VCT flooring, replace all pairs of exterior exit doors, replace gym upper windows, sand-blast and paint gym exterior metal, security cameras in classrooms, electronic lock security system at all exit doors, lock interface to fire alarm panel, alarm & detection, electrical repairs, room alterations & plumbing to replace missing fixtures in women’s gang toilet room, data & telecom. Entry sally-port fencing, gate & controls (with intercom and security cameras) at the main entrance, & related site work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents