Similar Projects
Moores Bridges WTP Chemical and Facility Upgrades
Renovation - 6,091 SF
Bidding
Norfolk, VA

Installation of New Water Distribution System
Renovation
Bidding
$60,000 est. value
Richmond, VA 23224

Fuma Sewage Treatment Plant Improvements
Renovation
Post-Bid
Fork Union, VA

Preventive Maintenance Program
Post-Bid
Portsmouth, VA

Water Treatment Plant Modernization and Chrisman Mill Pump Station projects
Results
$24,000,000 est. value
Radford, VA

Wastewater Clarifier 1 Replacement
Results
$325,000 est. value
Altavista, VA

Water Treatment Plant WTPFM Facilities Modifications
Construction
Richmond, VA 23219

Shenandoah Valley Organic Packaging Plant Expansion
New Construction - 132,600 SF
Pending Verification
$10,000,000 CJ est. value
Harrisonburg, VA 22802

Secondary Clarifier Drive Repair - CETP
Post-Bid
Virginia Beach, VA

Crozet Water Treatment Plant - Expansion and Rehabilitation
Results
$7,170,000 est. value
Charlottesville, VA

2020 Waterworks Improvements Phase II Project
Post-Bid
Radford, VA

Water Treatment Facility Courtyard Improvements
Results
Henrico, VA 23228

On Call Materials and Construction Related Testing Services
Term Contract
Post-Bid
Winchester, VA 22601

Building J Facilities Relocation and Decommissioning
New Construction, Renovation, Demolition - 47,000 SF
Results
$18,389,700 est. value
Alexandria, VA 22314

Mcgaheysville Wastewater Plant Lagoons Clean Out
Post-Bid
McGaheysville, VA 22840

Last Updated 03/03/2021 12:09 PM
Project Title

Nansemond Treatment Plant Struvite Recovery Facility Improvements (NP013700)

Physical Address View project details and contacts
City, State (County) Suffolk, Virginia Beach, VA 23435 (Suffolk City, Virginia Beach City Counties)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $710,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of replacement of the existing struvite dryer equipment and replacement of the Struvite Recovery Facility PLC, to include the installation of all piping, ancillary equipment, electrical, instrumentation, and control elements.

Details

Water Treatment Plant, New Construction, 1 Sewage Treatment Plant, Approximately 36,591 SF Renovation.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 05 - Metals, Structural Metal Framing.
Division 13 - Special Construction.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents