Similar Projects
Floating Fountain Quarterly Cleaning Services
Alteration
Bidding

Floating Fountain Quarterly Cleaning Services
Alteration
Bidding

Cooling Tower Piping Improvements and Site Hw Underground Piping Improvements
Infrastructure
Sub-Bidding
Bradenton, FL 34204

FAU Boca Building 38 Boiler Replacement and Electrical Switch Gear Upgrade
Post-Bid
Boca Raton, FL 33431

Rehabilitation Program - 18807 Autumn Lake Boulevard
Post-Bid
Less than $10,000 est. value
Hudson, FL 34667

Resins for Per Fluorinated Treatment System
Term Contract
Results
Stuart, FL 34994

Repair Munters ADU-300 Unit at Everglades National Park
Results
Homestead, FL 33030

Chiller System Replacement
Alteration
Bidding
Tampa, FL 33610

Replacement of Existing McQuay Chiller at Pensacola Downtown Public Library
Post-Bid
Pensacola, FL

J041--13th Floor Steam Station Replacement (VA-20-00048546)
Results
Miami, FL 33125

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

AAAF #1 Turbine Flush Water Distiller
Results
Less than $35,000 est. value
Jacksonville, FL 32221

Mechanical Insulation Services
Post-Bid
FL

Leachate Wastewater Treatment Plant Sand Filter
Results
$60,150 est. value
Punta Gorda, FL 33955

Repairs to Degasifer Unit
Post-Bid
Miramar, FL

Last Updated 03/11/2022 01:40 AM
Project Title

Chiller Replacement Project, St. Augustine Campus

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32084   (Saint Johns County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes the removal and replacement of the existing Smardt Chiller with a new 340-ton chiller, all electrical modifications as required, and the installation of a new refrigerant evacuation system. The contractor will reuse the existing pumps where possible, replace the condenser side piping and install a chemical treatment system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Centrifugal Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents