Similar Projects
SR 7 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Bellaire, OH 43906

SR 7 - Bridge Preservation
Demolition, New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Bellaire, OH 43906

IR 470 - Four Lane Resurfacing
Infrastructure
Bidding
$6,144,800 CJ est. value
Bellaire, OH 43906

IR 470 - Four Lane Resurfacing
Infrastructure
Bidding
$6,144,800 CJ est. value
Bellaire, OH 43906

RFQ Design - New Industrial Trades Center - Belmont Technical Center
New Construction, Infrastructure
Post-Bid
$942,282 CJ est. value
Saint Clairsville, OH 43950

Old Winding Hill Road
Infrastructure
Post-Bid
$400,000 est. value
Bellaire, OH 43906

Barton - Blaine Road County Road 10 Pavement Rehabilitation
Infrastructure
Results
OH

Road Improvements
Alteration
Results
Colerain, OH

Bikeways
Infrastructure
Design
$1,770,905 CJ est. value
Barnesville, OH 43713

SR 149 - Major Reconstruction
Infrastructure
Bidding
$8,783,062 CJ est. value
Belmont, OH 43718

Belmont County TR-219 MP 0.32 Slide Repair
Infrastructure
Post-Bid
$200,000 CJ est. value
Colerain Township, OH 43950

Cash Krupa Roadway Embankment Improvements
Infrastructure
Results
$393,926 est. value
Bellaire, OH

New K-12 Building - Shadyside Local School District
New Construction, Infrastructure
Design
$47,000,000 CJ est. value
Shadyside, OH 43947

US 250 - Slide Repair
Infrastructure
Bidding
$424,500 CJ est. value
Bridgeport, OH 43912

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Last Updated 04/17/2023 04:21 PM
Project Title

PTTGC America Ethane Cracker Plant

Physical Address View project details and contacts
City, State (County) Shadyside, OH 43947   (Belmont County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $7,500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 24, 2023, the project is awaiting a Final Investment Decision, there is currently no timeline for this decision to be finalized, site work and construction would be planned to start shortly thereafter. Construction is planned to last 4.5 - 5 years once started. The project scope includes gradual demolition of existing homes as they are acquired and the new construction of an ethylene production facility. Although full scope details have not been released, the plant would include six natural gas-fired furnaces.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents