Similar Projects
Landscape and Scenic Enhancement Highway:VA
Bidding
$286,294 est. value
TX

Landscape Development Highway:SH99
Bidding
$3,600,121 est. value
TX

Streetscape Improvements for East Exchange Avenue Between North Main Street and Packers Avenue
Post-Bid
Fort Worth, TX

Roadside Mowing Litter Landscape Maint
Post-Bid
Less than $738,466 est. value
TX

Vegetation Management
Results
Less than $467,781 est. value
TX

Clodine Site Cleanup
Results
Less than $6,000 est. value
Richmond, TX 77469

Landscaping in Various Locations Highway:VA
Bidding
$127,990 est. value
TX

Roadside Mowing
Post-Bid
Less than $293,490 est. value
TX

Landscape Development
Results
Less than $374,427 est. value
TX

IH0020 - Mowing Highway Right of Way
Bidding
$346,620 est. value
TX

Roadside Mowing
Post-Bid
Less than $156,145 est. value
TX

Reconstruct Pipe Entrance, add Landscaping and Lighting
Results
Less than $311,094 est. value
TX

US0180 - Mowing Highway Right of Way
Bidding
$134,421 est. value
TX

Roadside Mowing
Post-Bid
Less than $177,887 est. value
TX

Mowing Hwy Row and Litter Removal
Results
Less than $546,410 est. value
TX

Reported 12/17/2020 12:00 AM
Project Title

TIRZ 25 - Gateway Improvements

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $750,000 to $800,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project area is generally located inside Beltway 8 in southwest Houston and Harris County. The project limits are located within the City of Houston, and within the approximate rights-of-way of the project streets. Pavement Marking, Hardscape and Landscaping, Artwork which includes painting of column and beams under US 90A, and underpass lighting. Work under this contract is located at the following intersections: 1. Fondren Road and US 90A 2. Chimney Rock Road and US 90A 3. S. Post Oak Road and US 90A 4. Hiram Clarke and US 90A 5. Hillcroft Avenue and US 90A

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents