Similar Projects
Water Meter Replacement Program
Term Contract
Post-Bid
Sterling Heights, MI

23 Mile Road Water Main Replacement
Infrastructure
Post-Bid
Macomb, MI

2020 DWRF Project -14 Mile Road Water Main and PRV'SDWRF Project No. 7425-01Andutica Road Water Main -13 Mile Road to 14 Mile Road
Results
Less than $6,200,000 est. value
Fraser, MI

DWRF Water Main Replacement and PRV Installation
Results
Fraser, MI

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

Gate Valves
Results
Mount Clemens, MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

L.S. 79 & WWTP Metering Additions
Results
Less than $463,388 est. value
New Baltimore, MI

Marquardt Court Watermain Replacement Project
Results
New Baltimore, MI

MAC Arthur Boulevard Water Main and Pavement Replacement
Results
Warren, MI 48089

2020 Water Main Replacement Program
Results
Saint Clair Shores, MI 48081

Water Service Installations and Repairs
Results
Sterling Heights, MI

Water and Sewer Supply Parts
Term Contract
Results
Warren, MI

2020-2021 Sewer and Water Repair Supplies and Water Meters Contract
Term Contract
Results
Saint Clair Shores, MI 48081

2020 Mound Road Water Main Extension (North of 30 Mile Road to 31 Mile Road)
Results
Washington, MI

Last Updated 08/10/2021 12:07 PM
Project Title

Waltham Road Water Main Replacement (8 Mile to Toepfer)

Physical Address View project details and contacts
City, State (County) Warren, MI 48089   (Macomb County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes but is not limited to the following: 4,232 Lft Water Main, 8 inch, Abandon in Place 495 Lft Water Main, 8 inch, Rem 13 Ea Gate Valve & Well,Rem 3,351 Lft Water Main, DI, 8 inch, Tr Det A 3,351 Lft Polyethylene Encasement 5 Ea Gate Valve and Well, 8 inch 2 Ea Gate Valve and Well, 8 inch, Special 1 Ea Live Tap, 8 Inch X 12 Inch, Gate Valve and Well 18 Ea Water Main Connection 28 Ea Water Serv, Long 19 Ea Water Serv 4 Ea Water Main, 8 inch, Cut & Cap 3 Ea Hydrant, Rem 3 Ea Hydrant, Assembly 2,095 Syd Pavt, Rem 9,326 Syd Cold Milling Pavt, Surface, Modified 50 Ea Dr Structure Cover, Adj, Case 1 10,564 Sft Sidewalk, Rem 5,926 Lft Pavt Joint & Crack Repair, Det 7 (As-Needed) 210 Ton Hand Patching, HMA, 5E3 (As-Needed) 1,160 Ton HMA, 5E3 30 Ton Hand Patching, HMA, 2C 1,123 Syd Conc Pavt w/ Integral Curb, Nonreinf, 6 inch 932 Syd Driveway, Nonreinf, Conc, 6 inch 9,500 Sft Sidewalk, Conc, 4 inch 1,323 Sft Sidewalk, Conc 6 inch 150 Lft Detecable Warning Surface 4,219 Syd Restoration, Hydroseeding (Incl. 3" Topsoil, Seed & Fertilizer) The scope of the project is to replace the existing fire alarm system that is not functional, with a new addressable fire alarm system. This project shall include all design, calculations, conduit, wiring, programming, etc. for a complete and functioning system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents