Similar Projects
WVU Hospital Master Campus Plan - Phase 3
Addition, Demolition, Renovation, Infrastructure
Conception
$155,000,000 CJ est. value
Morgantown, WV 26505

Bethlehem Roadwork
Infrastructure
Design
$300,000 CJ est. value
Wheeling, WV 26003

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Instructional Design Center (IDC)/Distance Learning Center (DLC) Facility
New Construction, Infrastructure - 32,000 SF
Bidding
$25,000,000 CJ est. value
Harpers Ferry, WV 25425

Instructional Design Center (IDC)/Distance Learning Center (DLC) Facility
New Construction, Infrastructure - 32,000 SF
Bidding
$25,000,000 CJ est. value
Harpers Ferry, WV 25425

First Ave Nitro Traffic Signals +4
Infrastructure
Sub-Bidding
$750,000 CJ est. value
East Bank, WV 25067

Osage Casino and Hotel - Bartlesville - Roadway Package
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Hurricane, WV 25526

Water System Improvements Contract Nos 1, 2, and 3
Infrastructure
Post-Bid
New Cumberland, WV

New Fire Station for the Ridgeley VFD - Ridgeley Volunteer Fire Department
New Construction, Infrastructure
Post-Bid
$875,000 CJ est. value
Ridgeley, WV 26753

Water System Improvements
New Construction
Results
$9,255,000 est. value
Fairmont, WV 26554

Slack Plaza Renovations
Infrastructure
Results
Charleston, WV 25301

Sidewalk
Infrastructure
Construction
$141,765 CJ est. value
Clay, WV 25043

New Ranson and Shepherdstown Elementary Schools
New Construction, Infrastructure - 136,000 SF
Pending Verification
$20,000,000 CJ est. value
Ranson, WV 25438

Stockert Youth & Community Center
New Construction, Infrastructure
Pending Verification
$3,600,000 CJ est. value
Buckhannon, WV 26201

Parkersburg - Williamstown
Infrastructure
Design
$3,000,000 CJ est. value
Mineral Wells, WV 26150

Last Updated 09/13/2022 01:35 AM
Project Title

Water System Improvements for Woodrow Wilson High School

Physical Address View project details and contacts
City, State (County) Beckley, WV 25801   (Raleigh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $308,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Water System Improvements for Woodrow Wilson High School After opening, the bids will be compared as to quality, thoroughness, and cost by the Owner, and Architect Engineer (ZMM ARCHITECTS ENGINEERS). Lump sum bids are being solicited for Work included in the above referenced Bid Item for the Project indicated. The contract documents (digital) can also be obtained via download from ShareFile at no cost. Upon valid email address, ZMM (Phone: (540) 552-2151) will provide a password with instructions on accessing and downloading plans and specifications. The contract documents may be reviewed for bidding purposes without charge during business hours at the Blacksburg office of the Architect Engineer or at the locations provided below. All questions prior to bid must be made through Brenda McKinney of ZMM at: bmckinney@zmm.com Contractors may purchase additional sets of drawings from Charleston Blueprint at their own expense. Contractors purchasing additional bidding documents are also responsible for obtaining and purchasing copies of any and all addenda, including any shipping or handling costs. This is a Single Prime Contractor project. The purpose of the pre-bid conference is to familiarize the Bidders with the building and if they should have any questions regarding the Bidding Documents. All bids must be accompanied by a Bid Bond, executed by the Bidder and an acceptable Surety, in an amount equal to 5% of the bid. The successful bidder will be required to furnish and pay for a 100% Performance and Material Payment Bond in the amount of the bid (including all add alternates), as described in the Instructions to Bidders. Each bidder shall ensure that all employees and applicants for employment are not discriminated against because of race, creed, color, sex, or national origin. No bidder may withdraw his bid within sixty (60) days after the bid opening. The Owner reserves the right to conduct such investigation as necessary to determine the responsibility of a bidder, and to the extent permitted by state law; Raleigh County Schools reserves the right to reject any and all bids, and to make selections from the bids that are solely in the best interest of Raleigh County Schools. Bidders may examine the bid documents at the following locations: Raleigh County Board of Education Purchasing Department 2001 South Kanawha Street Beckley, WV 25801 Raleigh County Department of Maintenance 151 Cranston Drive Beckley, WV 25801 Parkersburg-Mariette Contractors Association 2905 Emerson Avenue Parkersburg, WV 26104-1216 Construct Connect 30 Technology Parkway South, Suite 100 Norcross, GA 30092 Construction Employers Assoc. of North Central WV 2794 White Hall Boulevard Whitehall, WV 26554 , Data & Analytics 3315 Central Avenue Hot Springs, AR 71913 Contractors Association of West Virginia 2114 Kanawha Boulevard East Charleston, WV 25311 Valley Construction News Roanoke Plan Room and Main Office 426 Campbell Avenue SW Roanoke, VA 24016 Pennsylvania Builder's Exchange 1813 North Franklin Street Pittsburg, PA 15233 Ohio Valley Constr. Employers Council 21 Armory Drive Wheeling, WV 26003 Kanawha Valley Builders Association 1627 Bigley Avenue Charleston, WV 25302 ZMM Architects Engineers 200 Country Club Drive SW Blacksburg, VA 24060 Contractors shall comply with all applicable national and state codes and regulations listed in the General and Supplementary Conditions. Pursuant to Chapter 21-Article 11 of the "West Virginia Contractor Licensing Act" of 1991, all Contractors doing business in West Virginia must be licensed to perform work in the State, the Contractor's WV License number must be affixed to all submitted construction bids and fully executed and binding construction contracts and agreements. By Order of the Board of Education Raleigh County Schools C. David Price, Superintendent

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents