Similar Projects
Y1NB--552-19-107: Replace Boilers (Building 147)
Design
$5,000,000 to $10,000,000 est. value
Dayton, OH 45428

Boiler Inspections New Buildings
Bidding
Columbus, OH

Boiler Controls
Bidding
Columbus, OH

Chiller Maintenance
Post-Bid
Dayton, OH 45433

Replace Hot Water Heating Lines in Weight Room and Gymnasium Sinclair Community College
Post-Bid
Less than $210,000 est. value
Dayton, OH 45390

Z--Remove Surgery Clean Steam System
Results
$25,000 to $100,000 est. value
Cleveland, OH 44106

Servo-Hydraulic Equipment Calibration Services
Results
Cleveland, OH 44135

Boiler Repair Service
Bidding
Columbus, OH

Water Meter Installation at C.J. Brown Dam & Reservoir
Post-Bid
$25,000 to $100,000 est. value
Springfield, OH 45503

34--Tin Knocker & Associated Items for the Cleveland VAMCs Engineering Department
Results
Cleveland, OH 44106

Boiler Replacement
Bidding
Less than $238,775 est. value
Cleveland, OH 44115

Evanston: Replace Base Board Heaters
Post-Bid
Cincinnati, OH

Shipley Mechanical Upgrades
Results
$565,910 est. value
Columbus, OH

Y--1B229 Mechanical Room (VA-19-00027342)
Post-Bid
$250,000 to $500,000 est. value
Cleveland, OH 44106

Z--Upgrade Water Systems for Legionella and Improve Water Efficiency 539-17-101
Results
$1,000,000 to $2,000,000 est. value
Cincinnati, OH 45220

Last Updated 12/05/2018 03:16 PM
Project Title

Z--Replace Operating Room Chillers 539-18-203

Physical Address View project details and contacts
City, State (County) Cincinnati, OH   (Hamilton County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Contractor shall provide all materials, labor, tools, equipment, insurance, supervision and any other items required to Replace Operating Room Chillers at the VA Medical Center (VAMC). Project will replace the two air-cooled chillers that are currently serving the operating rooms. Other modifications to the chilled water system will be performed to improve the performance of the chillers.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents