Similar Projects
NCSU Electrical Distribution
Renovation
Bidding
$47,211,000 est. value
Raleigh, NC

Carmichael Gymnasium Addition and Renovation
Post-Bid
$45,000,000 est. value
Raleigh, NC 27607

NOAA Tenant Improvements
Post-Bid
Raleigh, NC 27606

RTP Campus - General Classroom Building 2
Results
Less than $43,994,800 est. value
Raleigh, NC

Dabney Hall Evaluation and Upgrade Phase 2 METRIC Renovation
Renovation
Results
Raleigh, NC

Design Build for Restoration of Memorial Belltower
Construction
Less than $6,100,000 est. value
Raleigh, NC

WTCC - Building NR - Automotive and Collision Repair Facility
New Construction - 100,653 SF
Construction
Raleigh, NC 27616

Architecture Project Management Tupper Memorial Hall Rehabilitation
Renovation
Post-Bid
Raleigh, NC 27601

Elevator Additions - Tucker and Owen Residence Halls
Results
$1,400,000 est. value
Raleigh, NC 27695

Wake Tech Community College RT2
New Construction - 66,000 SF
Construction
Morrisville, NC 27560

Lab and Building Systems Renovations to Varsity Research Building
Renovation - 15,200 SF
Post-Bid
Raleigh, NC 27606

NCSU Fountain Dining Hall
Renovation
Results
Raleigh, NC 27695

Tupper Memorial Hall Renovation
Renovation - 15,000 SF
Construction
$211,430 est. value
Raleigh, NC 27601

Dairy Facility at CVM
Term Contract - 10,940 SF
Post-Bid
Less than $5,000,000 est. value
Raleigh, NC 27695

Renovations to the Don Ellis Building
Renovation - 7,000 SF
Results
Less than $1,000,000 est. value
Raleigh, NC

Last Updated 03/05/2020 10:26 AM
Project Title

Academic Success Center at DH Hill Library

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced May 2019, Construction Completion Expected June 2020
Bids Due View project details and contacts
Estimated Value $9,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CThe DH Hill Library Academic Success Center is a 40,000-sqaure foot renovation of two floors in the building's north and south wings, built respectively in 1972 and 1990. In addition to new interior finishes, the renovation scope includes the installation of a monumental staircase connecting the first floor mezzanine with the second and third floors, as well as the replacement of the adjacent exterior masonry with a three story curtainwall system. The project also includes three (3) new AHU's on the fourth floor to serve the newly created stair opening, second and third floors, amongst other sizable modifications to the existing systems and infrastructure associated with the change in use and compliance with building codes. The library will remain occupied and in operation throughout the duration of construction. HUB goal is 10% Proposals will be accepted only from pre-qualified contractors for the following Bid package 2: 02 Concrete 03 Masonry 05A Structural / Misc. Steel 05B Ornamental Metals 06A Millwork 07A Fireproofing 07B Waterproofing / Caulking 08A Exterior Glass 08B Doors / Frames / Hardware 08C Interior Glass 09A Drywall / ACT 09B VCT / Carpet 09C Ceramic / Porcelain Tile 09D Terrazzo 09E Painting / Wallcoverings 10B Horizontal Fire Shutters 10C Vertical Fire Shutters and Curtains 10D Specialties 10E Window Coverings 15A Fire Protection 15B HVAC 15C Plumbing 16 Electrical REBID Packages 03 Concrete 04 Masonry 05A Structural / Misc. Steel 05B Ornamental Metals 06A Millwork 07A Fireproofing 07B Waterproofing / Caulking 08A Exterior Glass 08B Doors / Frames / Hardware 08C Interior Glass 09B VCT / Carpet 09D Terrazzo 10B Horizontal Fire Shutters 10C Vertical Fire Shutters and Curtains 10D Specialties 10E Window Coverings 15A Fire Protection 15B HVAC 15C Plumbing

Details

College/University, 2 Stories Above Grade, 40,000 SF Renovation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents