Similar Projects
Fabricated Pipe and Pipe Fitting Manufacturing
Term Contract
Sub-Bidding
Los Angeles, CA 90012

As Needed Plumbing Maintenance and Repair for Metropolitan's Iron Mountain Pumping Pump Plant Housing
Term Contract
Post-Bid
$240,000 est. value
Los Angeles, CA

Walnut Park - Water Meter Replacement Project
Infrastructure
Post-Bid
$1,600,000 CJ est. value
Huntington Park, CA 90255

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Waste and Vent Lines Re-Pipe
Alteration
Results
$25,000 est. value
Los Angeles, CA

As-Needed Plumbing Repair Services for Metropolitan's Hinds Pumping Pump Plant Housing
Term Contract
Post-Bid
Less than $95,000 est. value
Los Angeles, CA

Plumbing Services - Los Angeles and Ventura County
Term Contract
Results
$1,155,852 CJ est. value
Los Angeles, CA 90012

As-Needed Plumbing Repair Services for Metropolitan's Eagle Mountain Pumping Plant Housing
Term Contract
Post-Bid
Los Angeles, CA

District 22 Trunk Sewers Group 1 Rehabilitation
Infrastructure
Results
$1,970,379 CJ est. value
Glendora, CA 91741

Marina Manor Senior Public Housing Development Buildings I and II Pipe Coating Project
Alteration
Post-Bid
$2,000,000 est. value
Marina del Rey, CA 90292

North Inglewood Booster Pump 3 Replacement Project
Renovation
Results
$74,000 CJ est. value
Inglewood, CA 90302

Drinking Fountain/Bottle Filler Installation
Alteration
Post-Bid
$60,000 est. value
La Mirada, CA

Ben Lomond Trunk Sewer Rehabilitation
Infrastructure
Results
$2,196,752 CJ est. value
Covina, CA 91723

RFQ Contractor - Beverly Hills Civic Center Chilled Water Pipe Replacement
Renovation
Post-Bid
$500,000 CJ est. value
Beverly Hills, CA 90210

Main Street, Fourth Street, And Mission Road Sewer Main Replacement Project - Phase 1
Infrastructure
Results
$3,291,245 CJ est. value
Alhambra, CA 91801

Last Updated 09/19/2023 01:48 PM
Project Title

Pier G 212-213 Shiploader No. 2 Replacement Project at Pier G Metro

Physical Address View project details and contacts
City, State (County) Long Beach, CA 90802   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $14,570,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work required by this Contract includes, but is not limited to, the following: Design, fabrication, delivery and construction of a replacement Shiploader, suitable for loading coal, petroleum coke, soda ash, calcite, sulphate, and pyrabor onto vessels, at Pier G. Signed Contract, Insurance and Bonds. If Conditionally Awarded a Contract by the Board, within thirty (30) calendar days after the Contract is conditionally awarded to the Contractor by the City, execute and deliver such Contract to the Chief Harbor Engineer together with all required documents including insurance forms, a Payment Bond for one hundred percent (100%) of the Contract Price, and a Performance Bond for one hundred percent (100%) of the Contract Price. All Bonds shall be on forms provided by the City. Conditional Award of Contract and Reservation of Rights. The Board, acting through the Chief Executive Officer, reserves the right at any time before the execution of the Contract by the City, to reject any or all Proposals, and to waive any informality or irregularity. The Conditional Award of the Contract, if any, will be to the responsible Proposer that submits the best value Proposal as specified in the Request for Proposals (RFP). If the best value selected Proposer fails to submit the required documents including insurance forms, bonds and signed Contract within thirty (30) calendar days after Conditional Award of Contract, NIP 30720.1p N-7 HD-S3123A the Board reserves the right to rescind the Conditional Award and Conditionally Award the Contract to the next highest scored, responsive Proposer. Prevailing Wage Requirements per Department of Industrial Relations. This Project is a public work Contract as defined in Labor Code Section 1720. The Contractor receiving award of the Contract and Subcontractors of any tier shall pay not less than the prevailing wage rates to all workers employed in execution of the Contract performed in the State of California. The Director of Industrial Relations of the State of California has determined the general prevailing rates of wages in the locality in which the Work is to be performed. The rate schedules are available on the internet at http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm and on file at the City, available upon request. Contractors are directed to Article 15 of the General Conditions for requirements concerning payment of prevailing wages, payroll records, hours of work and employment of apprentices.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents