Similar Projects
City Of Lax - Greenbay Sw And Curb Replacement
Infrastructure
Post-Bid

Curb and Gutter and Sidewalk Replacement
Results
Less than $2,490,000 est. value
Janesville, WI

New and Replacement Sidewalk
Results
Less than $106,000 est. value
Janesville, WI

Mckearn Park Parking Lot Improvements
Results
Beloit, WI 53511

Subdivision Construction
Results
Janesville, WI

2021 Street and Utility Improvements
Results
Milton, WI 53563

Parking Lot Improvements
Results
Janesville, WI

6th/North Street Turn Lane
Infrastructure
Results
Beloit, WI 53511

Euclid Avenue Reconstruction; Phase 1 and 2
Infrastructure
Results
Beloit, WI 53511

Edgerton West Fulton Street Crosswalks Replacement
Infrastructure
Results
Edgerton, WI 53534

Sidewalk Maintenance
Infrastructure
Results
Beloit, WI

Big Hill Bike Path
Infrastructure
Results
Beloit, WI

Cranston Road Corridor - Phase 1
Infrastructure
Results
Beloit, WI 53511

Curb and Gutter and Sidewalk Replacement
Infrastructure
Results
Janesville, WI

New and Replacement Sidewalk
Infrastructure
Results
Janesville, WI

Last Updated 02/14/2022 03:02 AM
Project Title

C. Edgerton, South Main Street, City Limit (CTH F) to Lord Street (USH 51); Janesville - Edgerton, W. High Street to Hain Street

Physical Address View project details and contacts
City, State (County) WI   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rock County; 5798-00-11, WISC 2022 198; 5798-01-74, WISC 2022 199; Local Street; CTH F; 2.089 Miles; Excavation, Base, HMA Pavement, Curb and Gutter, Sidewalk, Signs, Pavement Marking, Culvert Pipe, Storm Sewer, and Tree Planting. Excavation Common, 39,081 CY; Base Aggregate Dense, 23,847 Ton; Select Crushed Material, 12,361 Ton; Marking Epoxy, 40,845 LF; Construction Staking, 39,799 LF; Construction Staking, 71 Each; Construction Staking, 2 LS; Culvert Pipe, 140 LF 60”, 242 LF 15“, 68 LF 18“, 80 LF 24“; Storm Sewer Pipe, 967 LF 12“, 489 LF 15“, 90 LF 18“, 394 LF 21“, 2,214 LF 24“, 647 LF 30”, 186 LF 36”, 473 LF 8”; Storm Sewer / Culvert Pipe Horizontal Elliptical or Pipe Arch, 98 LF 21” X 15”, 106 LF 28” X 20”, 419 LF 34” X 53”; Concrete Curb and Gutter, 9,279 LF; Concrete Sidewalk, 28,702 SF; HMA Pavement, 9,631 Ton; Tack Coat, 2,907 Gals; Signs, 357 SF.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents