Last Updated | 05/11/2023 12:16 PM |
Project Title | Renovate Interior & Exterior-Moberly Readiness Center |
Physical Address | View project details and contacts |
City, State (County) | Moberly, MO 65270 (Randolph County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,132,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The exterior renovation will include the removal & replacement of all roofing, soffit, fascia, downspouts, & gutters; replacement of windows; minor brick repair & replacement; and the removal & replacement of the paint on the metal wall panels on the upper portion & East face of the Assembly Hall. Interior renovation will consist of complete gutting & remodel of the bathrooms & kitchen, painting all walls, removal & replacement of some flooring and some ceilings. Electrical system upgrades include all new electrical distribution & branch panels, new manual transfer switch, all new LED lighting, new receptacles/devices, new exterior parking lighting. Mechanical system upgrades include all new HVAC equipment & removal of un-operational equipment. Plumbing system upgrades include new hot water heaters & distribution piping to new restrooms & renovated kitchen area, and a new grease interceptor for food preparation. The drives, parking, sidewalks, street entrances, & some fencing will also be replaced and a storm drain system installed to direct water from the roof to the storm drain. The project has two alternates, removal of existing boiler and installation of a new generator. The Work consists of interior & exterior renovation of the Moberly Readiness Center, including replacement of roof, roof accessories, window, and MEP systems. Interior renovations will consist of remodeling the kitchen and bathrooms, painting all areas, and the replacement of some flooring and ceilings. Exterior work will include removal and repainting of all metal siding, and demolition and reinstallation of parking, sidewalks, some site drainage features - The Work includes TPO roof, aluminum windows, 2x stud walls w/ Gypsum, epoxy flooring, mechanical systems, electrical systems, plumbing fixtures, acoustic ceiling tile, paint, and site work. MBE 10%, WBE 10%, and SDVE 3% Completion- 170 working days |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |