Similar Projects
Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka
Renovation
Conception
$3,598,000 est. value
Topeka, KS 66612

East Filters Rehabilitation Phase II - 281102.01 - City of Topeka
Renovation
Conception
$5,185,000 CJ est. value
Topeka, KS 66612

WTP2: Chemical Feed Modification - 5-C-026-20 - City of Olathe
Renovation, Infrastructure
Design
$2,390,000 CJ est. value
Lenexa, KS 66227

Kansas River WWTP - City of Lawrence
Renovation
Design
$70,000,000 CJ est. value
Lawrence, KS 66044

Water Treatment Plant Filter Improvements
Infrastructure
Bidding
$1,500,000 CJ est. value
Mound Valley, KS 67354

Wastewater Treatment Plant Improvements - Phase 1
Infrastructure
Bidding
$100,000 CJ est. value
Derby, KS 67037

Wastewater Treatment Plant SCADA Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Wastewater Treatment Plant Solids Treatment Upgrade and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Manhattan, KS 66502

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

Water Treatment West Plant Basin Rehabilitation
Renovation
Results
Topeka, KS 66606

City of Wichita Northwest Water Facility (NWWF)
Addition
Construction
$20,000,000 CJ est. value
Wichita, KS 67203

Lime Feed Building and Basin Modifications at Water Treatment Plant No. 2 / Olathe
Renovation
Pending Verification
$11,000,000 CJ est. value
Olathe, KS 66051

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

Kaw WTP Infrastructure Rehab - MS-22-0032 - City of Lawrence
Renovation
Conception
$4,216,000 CJ est. value
Lawrence, KS 66044

Blue River WWTP Improvements - County of Johnson
Renovation
Design
$25,720,000 CJ est. value
Overland Park, KS 66221

Last Updated 07/26/2023 09:43 AM
Project Title

West Plant Basin Rehabilitation - 281164.00 - City of Topeka

Physical Address View project details and contacts
City, State (County) Topeka, KS 66612   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $4,293,462 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes structural repairs, modifications, and replacement of equipment of the West Plant at the Water Treatment Plant. Structural repairs and modifications include Primary Flocculation Basin, Primary Clarification Basins No. 1 and 2, Secondary Flocculation Basin, Secondary Clarification Basin, Recarbonation Basin, Final Recarbonation Basin, West Lime Facility, Weirs, Filters, and tunnel structural repairs. Basin equipment replacement including demolition of existing equipment, Primary Flocculation Basin, Primary Clarification Basins No. 1 and 2, Secondary Clarification Basin, Polymer Basin, wooden baffles with FRP, basin effluent launders, basin drain valves, basin washdown piping and valves, and electrical and lighting improvements. Filter rehabilitation includes structural repair, under drains rehabilitation, and replacement of media. As of July 12, 2022, this project is currently in the FY 2023-2032 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Storage Assemblies, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents