Similar Projects
Grade, Drain and Surface - SH 152
Infrastructure
Design
$13,000,000 CJ est. value
Minco, OK 73059

Grade, Drain and Surface - SH 152
Infrastructure
Design
$13,000,000 CJ est. value
Minco, OK 73059

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Drainage Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Amber, OK 73004

Sanitary Sewer Main Replacement
Infrastructure
Post-Bid
$400,000 CJ est. value
Chickasha, OK 73018

Slabjacking and Subsealing Services
Infrastructure
Results

Pavement Rehabilitation (Dbr/Diamond Grind) H.E. Bailey Turnpike: from M.P. 62.0 Extend Northeast To M.P. 78.0
Infrastructure
Results

Grade, Drain and Surface - SH 152
Infrastructure
Design
$13,000,000 CJ est. value
Minco, OK 73059

Daily Rate Bid for Asphalt Repairs
Term Contract
Post-Bid
$200,000 CJ est. value
Tuttle, OK 73089

Right-of-Way Clearance - Sh-19
Infrastructure
Results
OK

Grade, Drain, Bridge and Surface - OK 19
Infrastructure
Design
$30,321,155 CJ est. value
Ninnekah, OK 73067

Rush Springs Public Schools - Playground Project
Infrastructure
Post-Bid
$200,000 CJ est. value
Rush Springs, OK 73082

Resurface (Asphalt) From SH-37
Infrastructure
Results
OK

Grade, Drain, Bridge and Surface - SH 19
Infrastructure
Design
$10,971,041 CJ est. value
Ninnekah, OK 73067

Resurface (Asphalt) US-81
Infrastructure
Results
OK

Last Updated 03/14/2023 05:06 AM
Project Title

Interchange - US 81

Physical Address View project details and contacts
City, State (County) Chickasha, OK 73018   (Grady County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2026
Bids Due View project details and contacts
Estimated Value $33,651,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Us-81 Realignment: Quail Road Interchange Includes Br. A,b,c & D(Phase 3). As of March 14, 2023, the project is in Design status. Anticipated letting month/year is September, 2025. Length : 1.210 Mi. OKDOT - Interchange - US 81 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents