Similar Projects
Hart Dam Stairway & Erosion Repair
Renovation, Alteration
Bidding
$160,000 est. value
Hart, MI

Dam Removal - Tyler Dam Drain
Renovation
Bidding
$4,000,000 to $5,000,000 est. value
Ann Arbor, MI

Natural Science - Loading Dock Alterations
Post-Bid
East Lansing, MI

New Soo Lock, New Third Lock
New Construction
Post-Bid
$500,000,000 est. value
Sault Sainte Marie, MI 49783

Korpela to Wakefield Stateline Grade Extension Culvert and Bridge Replacement
Results
MI

Union Street Dam Fish Pass
Results
Traverse City, MI 49684

Jd #150
Renovation, Demolition - 11,569 SF
Construction
$550,000 est. value
Flint, MI

Sea Lamprey Trap (East Branch) Au Gres River, MI
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
Au Gres, MI

Milham Park Dam Removal
Results
Kalamazoo, MI

Multiple Tunnel Sections - South U Tunnel - Major Maintenance and Repair
Renovation
Post-Bid
Ann Arbor, MI

Eden Dam Modifications and Stabilization Measures
Results
MI

Perrin Dam Improvements
Results
Marshall, MI

Poe Lock Rehibition Ship Arrestors Sault Ste Marie, MI
Renovation
Results
$10,000,000 to $25,000,000 est. value
Sault Sainte Marie, MI

3.5 Mg Water Reservoir
Results
Shelby Township, MI

2021 Redridge Dam Rehabilitation
Renovation
Results
Houghton, MI

Reported 01/29/2022 12:00 AM
Project Title

Future Dam Removal Project

Physical Address View project details and contacts
City, State (County) Davisburg, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a pumped dewatering of the Mill Pond impoundment, dam removal, earthwork excavation of approximately 10,000 cubic yards of material to create 2,800 feet of restored river channel through the former impoundment, river restoration activities including installation of engineered rock riffles and log structures, and site restoration. The project will also include installation of an open bottom culvert (36 ft span, 80 ft long) under Davisburg Road, realignment, and reconstruction of approximately 700 feet of Davisburg Road, and site restoration

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents