Similar Projects
Thomas Metcalf School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$74,459,972 CJ est. value
Normal, IL 61790

University High School Replacement - Illinois State University
Demolition, New Construction, Infrastructure
Conception
$82,297,800 CJ est. value
Normal, IL 61761

Locust Street CSO Elimination and Water Main Replacement - Phase 4+5 Construction - City of Bloomington
Infrastructure
Design
$2,190,000 est. value
Bloomington, IL 61701

Fairview Senior Apartments
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Normal, IL 61761

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2023 Beech Street Pavement Replacement
Infrastructure
Bidding
$550,360 CJ est. value
Normal, IL 61761

Water Extension
Infrastructure
Post-Bid
Downs, IL

110,000 Gallon Standpipe Rehabilitation
Infrastructure
Post-Bid
$500,000 CJ est. value
Arrowsmith, IL 61722

White Oak Road and Hovey Avenue Water Main Extension
Infrastructure
Results
Normal, IL

Sugar Creek Force Main Improvements
Infrastructure
Results
Bloomington, IL

Heartland Community College - Agriculture Complex
New Construction, Infrastructure - 30,322 SF
Construction
$16,300,000 CJ est. value
Normal, IL 61761

Wonsook Kim College of Fine Arts Renovation
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$67,300,000 CJ est. value
Normal, IL 61761

The Trails at Sunset Lake
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Normal, IL 61761

QuikTrip / Bloomington
New Construction, Infrastructure - 8,000 SF
Design
$4,000,000 CJ est. value
Bloomington, IL 61705

Karr Street Reconstruction
Infrastructure
Bidding
$1,834,395 CJ est. value
Heyworth, IL 61745

Last Updated 02/13/2023 03:06 PM
Project Title

Division Street Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Chenoa, IL 61726   (McLean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $596,181 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 13, 2023, the project has been awarded. A timeline for construction has not been confirmed. Installation of approximately 1500 feet of 8 PVC watermain and associated services and appurtenances. The successful Bidder shall provide at least 40% of all labor required for the completion of this project. The Bid shall be accompanied by a bid bond in the amount of five percent of the gross amount of the bid. Bids may be held by the City of Chenoa for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Owner reserves the right to accept or reject any or all Bids and to waive any informalities in the bidding. Bidders are advised that this Contract will be subject to the Illinois Prevailing Wage Act. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents