Similar Projects
Marlboro Street Corridor Improvements / Trail Connector - City of Keene
Infrastructure
Conception
$1,104,000 CJ est. value
Keene, NH 03431

Beacon Replacement Project - 90216 / 05J0008 - City of Keene
Infrastructure
Conception
$500,000 CJ est. value
Keene, NH 03431

Hinsdale-Brattleboro Bridge - 12210C - New Hampshire Department of Transportation (NHDOT)
Demolition, New Construction, Infrastructure
Design
$61,200,000 CJ est. value
Hinsdale, NH 03451

Plane View Senior Apartments / Keene
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Keene, NH 03431

Demolition of Existing Beach Restroom and Septic System, Otter Brook Lake, Keene
Demolition, Infrastructure
Bidding
$250,000 CJ est. value
Roxbury, NH 03431

Addition / Fire Station 3
Addition, Demolition, Infrastructure - 360 SF
Post-Bid
$400,000 CJ est. value
Swanzey, NH 03446

KSC Owl Athletic Complex - Artificial Turf Replacement
Infrastructure
Post-Bid
$1,092,367 CJ est. value
Keene, NH 03431

Richardson Park Detached Bathroom Facility
New Construction, Infrastructure
Results
$4,000 CJ est. value
Swanzey, NH 03446

RFP D/B - Design-Build Services for the Creation of a New Concrete Skatepark
Infrastructure - 15,000 SF
Results
$225,000 CJ est. value
Versailles, KY 40383

U-Haul of South Keene Expansion
New Construction, Infrastructure, Renovation - 12,175 SF
Pending Verification
$5,000,000 CJ est. value
Keene, NH 03431

Summit Packaging Addition
Addition, Demolition, Infrastructure - 6,400 SF
Pending Verification
$3,500,000 CJ est. value
Keene, NH 03431

Airport Storage Expansion Phase II
New Construction, Infrastructure - 17,200 SF
Design
$2,000,000 CJ est. value
Swanzey, NH 03446

Swanzey Garden Apartments
New Construction, Infrastructure - 93,750 SF
Post-Bid
$30,000,000 CJ est. value
Swanzey, NH 03446

Salt Shed Site Development
Infrastructure
Results
$302,000 est. value
Keene, NH

Moore Nanotechnology Systems
Addition, Demolition, Infrastructure - 3,280 SF
Pending Verification
$1,500,000 CJ est. value
Keene, NH 03431

Last Updated 08/07/2023 10:22 PM
Project Title

Wilson Pond Dam Improvement Project

Physical Address View project details and contacts
City, State (County) Keene, NH 03431   (Cheshire County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $777,100 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of the Wilson Pond Dam Improvement Project is to reconstruct a portion of the existing dam so that it meets current dam safety regulations, which includes the ability to pass the 100-year flood event with a minimum of 1.0-feet of freeboard. In order to do so, this project consists of the excavation and removal of material on both the upstream and downstream sides of the existing dam, the demolition and installation of a new cast-in-place intake structure and reinforced concrete outlet pipe, the installation of a concrete hydraulic cut-off wall upstream of the original stonewall dam, raising of the earthen portions of the dam to contain the design flood, and the placement of a granular filter on the downstream side of the earthen portions of the dam. The project also includes traffic control measures on Arch Street. Two (2) lane travel is required at all times, and NHDOT approved traffic control measures are required. The Contractor is responsible for traffic control and shall prepare a traffic control plan, then coordinate with the NHDOT to review and obtain approval of the traffic control plan from NHDOT prior to mobilization. The control of water, including the bypass of discharges through the project site and into the downstream channel is required at all times. All construction shall be performed in the dry. Contractor shall submit a specific control of water plan to the Engineer and NHDES for review and approval prior to mobilization. Each BID must be accompanied by a certified check payable to the OWNER for five percent (5%) of the total amount of the BID. A BID BOND may be used in lieu of a certified check The anticipated Notice of Award is scheduled for May 31,2023 and the Notice to Proceed/Preconstruction Meeting will be scheduled for June 12,2023. Substantial Completion is October 4, 2023, and the date of readiness for final payment is November 8, 2023, a

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents