Similar Projects
2022 Utility and Street Construction - Village Meadows First Addition
Infrastructure
Bidding
$931,000 est. value
Hilbert, WI

Seal Coating, Wedging and Patching of Town Roads and Reconstruction of Sharon Street in St John
Infrastructure
Bidding
$200,000 est. value
Hilbert, WI 54129

2021 Road Paving
Post-Bid
Chilton, WI

Twin Valley Road Improvements
Infrastructure
Post-Bid

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

Pond View Estates Road
Infrastructure
Post-Bid
Sherwood, WI 54169

Asphaltic Concrete Pavement
Results
Chilton, WI

2022 Crack Seal Program
Infrastructure
Post-Bid
Hilbert, WI 54129

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Asphalt Street Resurfacing Program
Infrastructure
Post-Bid
Hilbert, WI 54129

Harrison Ryford Street and Highland Court Culvert and Roadway Construction
Results
WI 54952

Saint Charles Road Improvements, Paradise Road to CTH G
Results
Less than $510,000 est. value
Brothertown, WI

Saint Charles Road, TRID Improvements
Results
Less than $400,000 est. value
Brothertown, WI

2021 Street Paving Program
Results
WI 54915

Reported 04/08/2022 12:00 AM
Project Title

2022 Irish Road / Geiser Way / T.I.D. 6 Construction

Physical Address View project details and contacts
City, State (County) Chilton, WI   (Calumet County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $1,375,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of urbanization of 1,500 feet of Irish Road south of Highway '151', construction two new roadways with utilities (Geiser Way 700'; Bessy Lane 600'), construction of two regional detention ponds, and other utility and grading work to facilitate the T.I.D. #6 project area. Portions of the project have an optional 2023 completion date

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents