Similar Projects
Concrete Curb, Sidewalk and Gutter Construction
Infrastructure
Bidding

Westside Avenue Streetscape and Roadway Improvements
Infrastructure
Bidding
Jersey City, NJ 07097

Palisade Avenue Improvements (Section 2) - 14th Street to 30th Street (Phase 2) - From Station 35+50 to Station 76+00
Post-Bid
Union City, NJ 07087

FY 2018 NJDOT Trust Fund Various Streets
Post-Bid
West New York, NJ 07093

FY 2018 Meadowlands Parkway Rehabilitation
Results
Secaucus, NJ 07094

Door Replacement and Barrier Free Ramp
Results
$600,755 est. value
Jersey City, NJ 07304

Paving Upgrades at Rocco lmpreveduto Towers
Infrastructure
Bidding
Secaucus, NJ 07094

34th Street and Bergenline Avenue Intersection Improvements
Post-Bid
Union City, NJ 07087

Concrete and Curb Replacement as Needed at Various Bayonne Housing Authority Sites
Results
$188,250 est. value
Bayonne, NJ 07002

FY2021 Road Resurfacing
Infrastructure
Bidding
Union City, NJ

25th Street and Summit Avenue Intersection Improvements
Post-Bid
Union City, NJ 07087

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Various Streets - 2018
Post-Bid
Hoboken, NJ 07030

Route 3, from Route 46 to Route 495, Contract No: 001193180 Pavement Preservation Project
Results
$10,000,001 to $20,000,000 est. value

Sidewalk Repair at 332 MLK Boulevard
Post-Bid
Jersey City, NJ 07302

Last Updated 06/17/2021 02:42 PM
Project Title

2021 Capital Streets Improvements Project

Physical Address View project details and contacts
City, State (County) Union City, NJ   (Hudson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of improvements to 21st Street (from Palisade Avenue to New York Avenue), 28th Street (from John F. Kennedy Boulevard to Bergenline Avenue), 17th Street (Central Avenue to Summit Avenue), 12th Street (from Summit Avenue to Central Avenue), Summit Avenue (from 31st Street to 32nd Street), 44th Street (from John F. Kennedy Boulevard to Bergenline Avenue), 38th street (from Hudson Avenue to Park Avenue), and 24th Street (from Summit Avenue to Central Avenue). More specifically, work shall include the removal of existing curbs and sidewalks and select trees, construction and installation of new scored and stamped concrete sidewalks, concrete curbs, scored and stamped reinforced concrete driveways, installation of lighting foundations, shade trees, semi-circular granite block tree wells, reset window well grates, cellar door replacement, bollards, traffic markings, speed humps, painting various existing features, reset junction box frame and cover, full depth pavement repair, installation of ADA compliant curb ramps, upgrading inlets with bicycle safe grates and eco curb pieces, and HMA milling and paving.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents