Similar Projects
Thompson Road Improvements
Post-Bid
WI

Local Road Improvement Project (LRIP)
Infrastructure
Post-Bid
Ettrick, WI 54627

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Road Improvements
Results
Eleva, WI

2021 Road Work
Infrastructure
Post-Bid
Dodge, WI

2021 Street and Utility Improvements
Results
$750,000 est. value
Strum, WI

Road Project Bids - 2022 - Single Chip Seal
Infrastructure
Post-Bid
Eleva, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Chitko Court Pavement Replacement
Infrastructure
Post-Bid
$120,000 est. value
Arcadia, WI 54612

Osseo 5th St Neighborhood Revitalization CDBG-PF Improvements
Results
Osseo, WI 54758

Town of Dodge Road Bid
Infrastructure
Post-Bid
$600,000 est. value
Trempealeau, WI 54661

Trempealeau - Fountain City, Tremp River E. Channel Bridge
Results
Fountain City, Trempealeau, WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

2021 Town Road Improvement - Eide Lane
Results
Eleva, WI 54738

Grassed Waterway Rock Crossing Critical Area Seeding
Infrastructure
Post-Bid
$100,000 CJ est. value
Trempealeau, WI 54661

Last Updated 07/26/2022 04:08 PM
Project Title

2022 Street Bids

Physical Address View project details and contacts
City, State (County) Arcadia, WI 54612   (Trempealeau County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Chip Sealing the Following Streets: o David Avenue (Fairfield Ave. To Pearl St.) o Dale Street (Wilson Ave. To David Ave.) o Jefferson Street (Fairfield Ave. To Simpson St.) o Blaschko Avenue (Sobotta St. To Hwy. 93) o Dettloff Drive (Blaschko Ave. To Termini) o Pahl Street (County Rd. A to Spring St.) o Spring Street (Pahl St. To Park St.) o John Street (Pahl St. To County Rd. A) o Hillview Drive (Sobotta St. To Termini) o Oak Lane Drive (Sobotta St. To Hillview Dr.) o Schank Court (Oak Lane Drive to Termini) o King Street (Mckinley to Termini) o City Hall Parking Lot (945 S. Dettloff Drive) the City May Elect to Do All, or a Portion of, the Streets Listed Above. All Manholes and Water Valve Boxes to Be Covered Prior to Chip Sealing by Contractor. All Streets Have Been Marked and Any Questions Can Be Directed to Rollie Conrad at 608-863-0790. Bid Consideration Will Be at the July 20, 2022 Common Council Meeting at 5:30 P.m. Work Must Be Completed by September 30, 2022. The City Reserves the Right to Reject Any or All Bids, to Waive Any Informality in Bidding, and to Accept the Bid Most Advantageous to the City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents