Similar Projects
Football Stadium Parking Expansion
Infrastructure
Conception
$4,700,000 est. value
Paradise, CA 95969

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

BLNC Offsite Improvements East Brundage Lane and Dr Martin Luther King Jr BLVD
Term Contract, Infrastructure, Alteration
Bidding
$198,000 est. value
Bakersfield, CA 93304

Crack Sealing Various Streets
Infrastructure
Bidding
Less than $295,000 est. value
Stockton, CA 95939

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Post-Bid
$22,300,000 est. value
CA

Contract for Streets and Sidewalk Maintenance 2021
Infrastructure
Post-Bid
$850,000 est. value
San Luis Obispo, CA 93401

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

Place RHMA-G and High Friction Surface Treatment
Infrastructure
Bidding
$1,570,000 est. value
CA

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Primary #3 Corrosion Rehabilitation
Alteration
Bidding
Marina, CA

Asphalt Rubber Cape Seal and Traffic Calming Project
Infrastructure
Post-Bid
$500,000 est. value
Suisun City, CA 94585

South 99 Frontage Road (East) Resurfacing
Infrastructure
Results
$570,000 to $670,000 est. value
Stockton, CA

Last Updated 03/02/2022 10:22 AM
Project Title

Byron Highway at Byer Road Safety Improvements

Physical Address View project details and contacts
City, State (County) Martinez, CA   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,229,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done generally consists of pavement widening along Byron Highway between the intersection with Hoffman Lane and 550 feet south of the intersection with Byer Road to construct a two-way-left turn lane along Excelsior Middle School frontage and a left turn pocket at the intersection with Byer Road. Ancillary improvements include striping, drainage facilities, slurry seal, a concrete median, hot mix asphalt walkway, driveway conforms, relocation and installation of rectangular rapid flashing beacon systems and installation of speed feedback signs.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents