Similar Projects
Carroll Street Restoration - 2022
Infrastructure
Post-Bid
$300,000 est. value
Carroll, IA

Carroll Iowa Street Resurfacing - 2018
Infrastructure
Post-Bid
$750,000 CJ est. value
Carroll, IA 51401

Middle School and High School Bus Loop Parking and Storm Sewer Improvements
Infrastructure
Results
Manning, IA 51455

Granular Surfacing of Roadway
Infrastructure
Results

Sauk Rail Trail - City Of Carroll
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carroll, IA 51401

Sauk Rail Trail - City Of Carroll
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carroll, IA 51401

Lidderdale Wastewater System Improvements
New Construction, Renovation, Infrastructure
Post-Bid
$2,650,000 CJ est. value
Lidderdale, IA 51452

Various Routes - HMA Resurfacing with Milling
Infrastructure
Results
$125,000 est. value

Engineering Services Downtown Coon Rapids Streetscape
Infrastructure
Pending Verification
$220,000 CJ est. value
Coon Rapids, IA 50058

Liberty Rock Plaza - Phase 1
Infrastructure
Post-Bid
$45,000 CJ est. value
Glidden, IA 51443

Community Development Block Grant (CDBG) Manning Facade Rehabilitation
Renovation, Infrastructure
Results
$296,023 CJ est. value
Manning, IA 51455

2021 Bond - IKM-Manning Community School District
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$19,950,000 CJ est. value
Manning, IA 51455

Stadium View Subdivision
Addition, Infrastructure
Post-Bid
$578,500 CJ est. value
Manning, IA 51455

Readiness Center Site Improvements
Infrastructure
Results
$195,000 CJ est. value
Carroll, IA 51401

Last Updated 07/21/2023 01:03 PM
Project Title

North Ridge Addition Plat 2 - Phase 1

Physical Address View project details and contacts
City, State (County) Templeton, IA 51463   (Carroll County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done at the location shown on the plans includes construction of the North Ridge Addition Plat 2 - Phase 1 including all labor, materials and equipment necessary for pavement removal, approximately 514 SY of 7" PCC street pavement, 15 LF of PCC curb and gutter, 32 SY of PCC sidewalk, 232 LF of 6" water main, subgrade preparation, modified subbase, and miscellaneous associated work, including cleanup. The work shall be substantially completed with the site stabilized by November 17, 2023. Final seeding shall be completed by May 31, 2024. Liquidated damages in the amount of Two Hundred Fifty Dollars ($250.00) per consecutive calendar day will be assessed for each day that the work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. The Contractor will be paid ninety-five percent (95%) of the Owners final estimate of value of acceptable work completed. Final payment will be made not earlier than thirty-one (31) days after completion of the work and acceptance by the Owner. No such final payment will be due until the Contractor has certified to the Owner that the materials, labor and services involved in the final estimate have been paid for in full. The Contractor submitting the successful Quotation will be required to furnish bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Owner and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the Owner from claims and damages of any kind by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the Owner. Bid security or bid bond not required The City of Templeton reserves the right to reject any or all Quotations, to waive informalities, and to enter into such contract as it shall deem to be in the best interest of the City of Templeton.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents