Similar Projects
West Broadway Elementary
New Construction, Alteration - 79,180 SF
Bidding
Louisville, KY 40210

Optimist Park Sidewalk Improvements
Infrastructure
Bidding
Vine Grove, KY

Removal and Replacement of Concrete Sidewalk Sections in Zone #2 - Various Street Locations
Post-Bid
Erlanger, KY

Deboard Terrace Construction Improvements
Post-Bid
Ashland, KY 41101

Main Street Sidewalk and Retaining Wall Construction
Results
Bromley, KY

Concrete Restoration
Term Contract
Results
Less than $336,000 est. value
Erlanger, KY

Virginia Avenue Sidewalk Replacement
Infrastructure
Bidding
Fort Mitchell, KY 41017

Concrete Sidewalk and Driveway Replacement
Post-Bid
Versailles, KY

Curb/Sidewalk Repair & Reconstruction
Results
Newport, KY

Downtown Sidewalk Connections
Infrastructure
Bidding
Brandenburg, KY

Louisville Hyundai Parking & Vehicle Display Expansion
New Construction
Post-Bid
Louisville, KY 40258

Southgate Community Center Trail Improvement Project
Results
$570,162 est. value
Southgate, KY 41071

Unit Price Concrete Projects 2021
Term Contract
Bidding
Frankfort, KY

Parking Lot Striping, Resurfacing and Maintenance
Post-Bid
Louisville, KY

Concrete Pavement and ADA Sidewalk
Term Contract
Results
Burlington, KY

Last Updated 06/18/2021 03:24 AM
Project Title

Parking Lot Lighting Upgrades

Physical Address View project details and contacts
City, State (County) Frankfort, KY   (Franklin County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $219,829
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of adding new light fixtures on existing poles at three parking areas. The parking areas includes the Cabinet for Human Resources (CHR) Parking Lot located at Cold Harbor Drive, the KY Public Service Parking Lot located at Sower Blvd, and The KY State Lab Parking Lot located at Sower Blvd. The parking lot will remain in use by the public and building staff throughout the project.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents