Similar Projects
Montgomery Run Bridge
New Construction, Infrastructure
Conception
Clearfield, PA

SR 6 over Delaware River
Renovation, Infrastructure
Design
Matamoras, PA

SR 1013 over Stony Brook
New Construction, Infrastructure
Design
Zion Grove, PA

Bridge No. 21-2022 Repairs
Renovation
Bidding
$335,000 est. value
Brookville, PA 15825

Culvert Replacement - Cross Street over Schweyer Run
Infrastructure
Bidding
$1,300,000 est. value
Mifflintown, PA

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

SR 87 over Kettle Creek
Renovation, Infrastructure
Design
Hillsgrove, PA 18619

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Quaker Falls Bridge Rehabilitation
Results
New Castle, PA 16101

Replacement of a Bridge Superstructure on Workers Road
Post-Bid
Curwensville, PA

Bridge Repairs
Results

Bridges Replacement
New Construction
Post-Bid
PA

Reported 04/29/2022 12:00 AM
Project Title

2022 NC Bridge Preservation

Physical Address View project details and contacts
City, State (County) Bradford, PA 16701   (McKean County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 to $999,999
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the Improvement/repairs to Bridges in Mckean County, Eldred Borough, Commonwealth of Pennsylvania, SR 0346 Section P33. Bridges Are Located on SR 0346 at Segment 0630 Offset 0713 and on SR 1023 at Segment 0010 Offset 0000. For the Rehabilitation of the Bridges. Construction Involves Concrete Bridge Deck Repairs, Concrete Repairs of Abutment, Epoxy Overlay of Bridge Decks, Cleaning and Painting of Steel Bearings, Strip Seal Dam Replacement, Pavement Markings, Temporary Traffic Signals, and Miscellaneous Construction for a Total Construction Length of Approximately 882 Feet (0.15 Miles) as Indicated on the Approved Drawings Included in the Bid Package.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents