Similar Projects
Floor Drains and Plumbing Upgrades
Alteration
Bidding
$100,000 est. value
Nashville, TN 37203

Sewer Repairs / Renovations at Haywood High School - Bid Packages Plumbing and Concrete
Alteration
Bidding
$140,000 est. value
Brownsville, TN 38012

Correct Plumbing Piping and Replace Fixtures
Post-Bid
$5,000,000 to $10,000,000 est. value
Memphis, TN 38104

Tower Floor Drains and Plumbing Upgrades
Post-Bid
Nashville, TN 37243

Correct Plumbing Piping and Replace Fixtures
Results
$5,000,000 to $10,000,000 est. value
Memphis, TN 38104

TSU MPE Systems Upgrades
Results
McMinnville, TN 37110

Contracted Plumbing Service/Maintenance
Alteration
Bidding
Cleveland, TN

Ductile Iron Pipe
Term Contract
Post-Bid
Maryville, TN

Parrottsville Elementary School Plumbing
Results
Parrottsville, TN 37843

Concrete and Plumbing for Splash Pad
Post-Bid
Mount Pleasant, TN

HOC Northwest Building
Renovation
Results
Knoxville, TN

Plumbing Parts For Sumner County Jail
Term Contract
Post-Bid
Gallatin, TN 37066

Finished 16`X 24`Addition to the Existing Office Building
Addition
Results
Newport, TN 37821

Plumbing Services
Term Contract
Post-Bid
Chattanooga, TN

Water/Sewer Pipe and Fittings
Alteration
Results
Pigeon Forge, TN

Reported 06/14/2022 12:00 AM
Project Title

Jail Plumbing

Physical Address View project details and contacts
City, State (County) Wartburg, TN 37887   (Morgan County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Services to replace 2 Tabco faucets, 2-1 1/2 P-traps, 4-1/2 angle stops, re-pipe drains for a 2-compartment sink , replace T&S faucet sprayer, 4 supply lines and a Delta single handle faucet. Description of Work: Mechanical room does not have a mixing valve installed. When new water heaters were installed the mixing valve was disconnected. The mixing valve is needed for scald prevention in the showers. Mechanical room needs to be reworked and mixing valve needs to be installed.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents