Similar Projects
RFP Engineering - Phase I of the North Complex Hazeltine Pump Station and Complex EI and C Project
New Construction, Infrastructure
Bidding
$720,000 est. value
Commerce City, CO 80640

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

Milavec West Pump Station Screen and Filter Improvements
Post-Bid
Frederick, CO 80530

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Clarkson Pump Station
Results
Denver, CO 80204

ERWSD & UERWA Water Storage Tank and Booster Pump Stations Hatch Improvements
Post-Bid
Vail, CO

Nine-Mile Driver Relief Station Replacement
Results
Denver, CO

Zone 3/4 Pump Station MCC Replacement and VFD Install
Renovation
Post-Bid
Thornton, CO

South Street Vrain Creek Pipeline Packaged Pump Station Equipment Package
Results
Longmont, CO

VCC Lift Station Design-Build Rehabilitation
Post-Bid
Aurora, CO 80016

Santa Rita Pump Station MCC Installation
Results
CO

Waste Water Lift Station Pump and Grinder Replacement
Renovation
Post-Bid
Black Hawk, CO 80422

CTF TCF Water Pump Skid Repl. Dq1 GC CMS165046
Results
Less than $60,000 est. value

Piney Creek Lift Station Upgrades
Renovation
Post-Bid
$2,500,000 to $2,700,000 est. value
Aurora, CO 80016

Frisco Bay Marina Sewage Lift Station and Deep Utilities
Results
Breckenridge, Frisco, CO 80424

Last Updated 06/09/2022 04:17 AM
Project Title

Roxborough Lift Station Pump P-201 Replacement

Physical Address View project details and contacts
City, State (County) Littleton, CO 80125   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $260,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of moving a 150 HP dry-pit wastewater pump from position 1 to position 3 and the installation of an Owner supplied 200 HP dry-pit configuration, centrifugal wastewater pump in position 1. The work includes associated demolition and replacement of pump base, interior process piping within the lift station; installation of a new Owner supplied harmonic filter, and miscellaneous electrical and controls for the pump

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents