Similar Projects
Enon Road (SR 753) Widening: Route 1 to I-95 - Stafford County
Infrastructure
Conception
$6,100,000 CJ est. value
Fredericksburg, VA 22406

A-115 - Aquia Bridge Force Main - County of Stafford
Infrastructure
Conception
$2,910,000 CJ est. value
Stafford, VA 22554

Burns Corner Mixed-Use Development
New Construction, Infrastructure - 7,030 SF
Design
$20,000,000 CJ est. value
Stafford, VA 22554

Red Apple Pediatric
Demolition, New Construction, Infrastructure
Design
$4,000,000 CJ est. value
Stafford, VA 22556

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Chick-fil-A #5105 / Stafford
New Construction, Infrastructure - 5,193 SF
Bidding
$2,000,000 CJ est. value
Stafford, VA 22554

Berea Church Road Improvement
Infrastructure
Post-Bid
$8,029,251 CJ est. value
Fredericksburg, VA 22406

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Lake Arrowhead Dam Renovation
Infrastructure
Results
$1,696,420 CJ est. value
Stafford, VA 22556

Telegraph Road (SR 637) and Woodstock Lane (SR 639) at Route 1 Safety Improvements - Stafford County
Infrastructure
Pending Verification
$10,489,437 CJ est. value
Stafford, VA 22554

Enon Road (SR 753) Widening: Route 1 to I-95 - 2019 Transportation Bond - Stafford County
Infrastructure
Pending Verification
$10,600,000 CJ est. value
Falmouth, VA 22406

Replace 18", 15" and 12" with 24" Line along Claiborne Run from Morton Road to Kings Hill Road - LFR-15 - County of Stafford
Infrastructure
Conception
$1,856,700 CJ est. value
Stafford, VA 22554

Burns Corner Medical Office Building
New Construction, Infrastructure - 42,000 SF
Design
$20,000,000 CJ est. value
Stafford, VA 22554

Safety Improvements
Infrastructure
Bidding
$688,000 CJ est. value
Fredericksburg, VA 22405

Last Updated 03/07/2023 07:13 PM
Project Title

Pressure Zone Upgrade

Physical Address View project details and contacts
City, State (County) Stafford, VA 22554   (Stafford County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $5,208,430 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish and install approximately 8,202 linear feet of 24-inch water main. Appurtenant work shall include valves, fire hydrants, air release appurtenances, interconnections and all associated clearing, erosion control, restoration, appurtenances and all other miscellaneous work as described int he Contract Documents. Every request for such interpretation should be in writing addressed to the Stafford County Procurement Office at Procurement@StaffordCountyVA.gov, and to be given consideration must be received no later than January 11, 2023 at 11:00 a.m. Each Bid over $100,000 must be accompanied by (1) Letter of Credit; or (2) a Cashier's Check or a Certified Check from the Bidder in an amount not less than five percent (5%) of the Bid, made payable to the County of Stafford; or (3) a Bidder's Bond on the Bid Bond Form provided herein or on a similar form which in every respect materially complies with said Bid Bond Form, in the amount of five percent (5%) of his/her Bid. The Bidder's Bond shall be issued by a surety company licensed to conduct business in Virginia and acceptable to the County. Any Cashier's Check or Certified Check shall be received by the Procurement Office on or before the time bids are due. The successful Bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Sum as security for the faithful performance of this Contract, and also a Labor and Material Payment Bond in an amount not less than one hundred percent (100%) of the Contract Sum, as security for the payment of all persons performing labor and furnishing materials under this Contract. The Performance Bond and the Labor and Material Payment Bond shall be in separate instruments acceptable to the County, in accordance with State law and shall be delivered to the County not later than the date of execution of the Contract. The surety shall be such surety company or companies that are acceptable to the County and that are authorized to transact business in the Commonwealth of Virginia. The time for completion of this Contract shall be as fixed in the Owner-Contractor Agreement. Unless otherwise specified in the County-Contractor Agreement, or Specifications, liquidated damages for non-completion within the stipulated time shall be six hundred twenty dollars ($620) per calendar day for Substantial Completion and four hundred twenty dollars ($420) per calendar day for Final Completion. Stafford County reserves the right to reject any or all Bids and to waive any informalities in the bidding.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents