Similar Projects
Sidewalk and Drainage Improvements
Infrastructure
Bidding
Saint Charles, MO

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

Spanish Pond ADA Improvements
New Construction
Results
MO 63138

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

2021 Sidewalk Replacements
Post-Bid
Saint Joseph, MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Results
Gladstone, MO

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Athletic and Parking Improvements Package B and Asphalt Improvements
Post-Bid
Independence, MO 64055

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Sidewalks
Infrastructure
Post-Bid
Iberia, MO

Last Updated 12/20/2021 04:14 AM
Project Title

Signal and ADA Improvements

Physical Address View project details and contacts
City, State (County) MO   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J9S3063B Route M SCOTT County. Signal and ADA improvements from the West Outer Road of I-55 to East Outer Roads of I-55 in Scott City, the total length of improvement being 0.296 miles.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents