Similar Projects
Gold Lake Mountain Resort
New Construction, Renovation, Demolition
Design
Ward, CO 80481

1015 Transit Tree Replacement
Term Contract
Post-Bid
Colorado Springs, CO 80903

New Snow Removal Equipment (SRE) Building - San Luis Valley Regional/Bergman Field
New Construction
Design
$1,000,000 est. value
Alamosa, CO 81101

HVAC Air Purification System Transit Administration Building
Renovation
Post-Bid
$70,000 CJ est. value
Colorado Springs, CO 80903

Pena Station Filing 3 - Core - Park Infrastructure
Renovation
Results
$25,000,000 est. value
CO

Transit Maintenance Electric Meter Retrofit
Renovation
Post-Bid
$50,000 CJ est. value
Colorado Springs, CO 80903

D.A. Building Purchase and Installation of New Electric Vehicle Charging Station
Alteration
Results
Brighton, CO 80601

Public Transit Operations Facility
New Construction - 63,000 SF
Post-Bid
Winter Park, CO

Justice Center Purchase and Installation of Electric Vehicle Charging Stations
New Construction
Results
Brighton, CO 80601

CM/GC or General Contractor Services
New Construction, Renovation
Post-Bid
$800,000 to $18,000,000 est. value
Idaho Springs, CO 80452

Passenger Amenity Program - Bus Stop Improvements
Infrastructure
Results
$210,000 to $257,000 est. value
Denver, CO

Loveland Transit Center
New Construction
Results
$2,300,000 est. value
Loveland, CO 80538

Service Street
New Construction, Infrastructure
Conception
Thornton, CO 80023

On-Call Bus Shelters, Benches, and Amenities
New Construction
Post-Bid
Colorado Springs, CO 80903

Bus Storage Facility
New Construction
Post-Bid
Crested Butte, CO

Last Updated 08/05/2022 09:32 AM
Project Title

Maintenance Shop Retrofit

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80903   (El Paso County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $430,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Colorado Springs Transit Services, DBA Mountain Metropolitan Transit (MMT), would like to receive proposals from licensed contractors for our Maintenance Retrofit project. MMT intends to utilize one Contractor to complete all required tasks for the retrofit, including procurement, assembly, and installation of the work platform system and the crane system for battery electric bus service. Buyers Requirements General Requirements - Insurance Required - Contractors License Required - Installation Required - Federally Funded - Certified Payroll Award Requirements - All or None Award Bonding Requirements Buyer Requires E-Bonding - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % Question Acceptance Deadline 07/22/2022 07:00 PM EDT Questions are submitted online No

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents