Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Construct Wastewater Metering Station
New Construction
Design
$100,000 to $250,000 est. value
Decatur, GA 30033

RFP - Design and Engineering Services During Construction for Snapfinger Advanced Wastewater Treatment Facility Expansion - Phase 3A Project (Multiyear Contract)
Term Contract
Bidding
Decatur, GA 30034

RFQ Design - Professional Architectural and Engineering Design Services for Dresden Elementary School Replacement
Demolition, New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Atlanta, GA 30341

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Design of Shared Use Path Dunwoody Elementary School
Post-Bid
Dunwoody, GA 30338

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Multiple Award Contract (MAC), Indefinite Delivery /Indefinite Quantity (IDIQ), Architect-Engineer (A-E) Traffic Engineering and Transportation Planning Services in Support of Projects Primarily in the Mid-Atlantic (NAVFAC MIDLANT) Area of Responsibility
Term Contract
Post-Bid
$40,000,000 est. value

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

Indefinite Delivery/Indefinite Quantity Architectural/Engineering Services
New Construction, Term Contract, Infrastructure
Post-Bid
$10,000 to $10,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

Last Updated 10/03/2022 03:12 PM
Project Title

Tucker-Northlake Trail Design

Physical Address View project details and contacts
City, State (County) Tucker, GA 30084   (DeKalb County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Schematic Drawings, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 2022, an engineering firm has been selected and the project is in early design. A firm contractor bidding and construction schedule have not been established. From qualified firm(s) or organization(s) to provide consultant services for concept report and engineering design services for the Tucker-Northlake Trail from downtown Tucker to Northlake Mall. For the Scope of Services for the project/contract listed in Exhibit I. Firms that respond to this RFQ, and are determined by the City of Tucker (City) to be sufficiently qualified, may be deemed eligible, and invited to offer a technical approach and/or possibly present and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this document, and are cautioned to completely review the entire RFQ and follow instructions carefully. The City of Tucker reserves the right to reject any or all SOQs or Technical Approach, and to waive technicalities and informalities at the discretion of the City. The method of Contractor Selection has not been Determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents