Similar Projects
Wastewater Treatment Plant Expansion
Addition
Design
Divide, CO

Progressive Design Build Procurement for the Telluride Regional Wastewater Treatment Plant (TRWWTP) Expansion Project
Addition
Bidding
$300,000 est. value
Telluride, CO

General Contractor for Various Wastewater Reclamation Facility Equipment Upgrades
Renovation
Bidding
$250,000 est. value
Pueblo, CO

Sterling Wastewater System Improvements Bid Package 100 Headworks and Influent Pump Station
Post-Bid
$5,000,000 to $7,000,000 est. value
Sterling, CO

Wastewater Treatment Plant Equipment
Post-Bid
Johnstown, CO

Peetz Wastewater Treatment Facility
Results
$1,500,000 to $2,000,000 est. value
Peetz, CO 80747

Center Sanitation District Wastewater Treatment Plant Improvements
Results
Lakewood, CO

Construction Manager at Risk Wastewater Treatment Facility Improvements
Construction
Platteville, CO 80651

Harold D. Thompson Wastewater Treatment Facility (HDT) - Aeration Basin 3 - Biological Nutrient Removal (BNR)
Renovation
Construction
Fountain, CO

Wastewater System Improvements - 2021
Renovation
Bidding
$400,000 est. value
Palmer Lake, CO

Bid Package 300 Sterling Wastewater System Improvements
Post-Bid
$15,000,000 to $20,000,000 est. value
Sterling, CO 80751

ERMD New Sewage Treatment Plant
Results
$6,000,000 to $7,000,000 est. value
Durango, CO 81301

Construction Manager - CMGC Services for Prosper Wastewater Treatment Plant (WTP) and Water and Wastewater Treatment Plant (WWTP) all Improvements
Renovation
Bidding
$18,000,000 est. value
Watkins, CO 80137

Rifle Wastewater Reclamation Facility Dewatering Improvements
Post-Bid
Less than $744,000 est. value
Rifle, CO

Replacement for Water Resource Recovery Facility Laboratory
Results
Boulder, CO 80304

Reported 04/25/2022 02:13 PM
Project Title

Headworks Building

Physical Address View project details and contacts
City, State (County) Rangely, CO   (Rio Blanco County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method
Project Status Construction Commenced 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of construction of a new headworks building rated for 1.0 MGD max. daily flow, installation of a pre-purchased Huber primary treatment package plant, new influent and effluent wet wells and piping, site work and grading, electrical equipment installation, HVAC equipment installation, and all associated process piping, wiring and controls.

Details

Sewage Treatment Plant, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Metal Doors and Frames, Stainless-Steel Doors and Frames.
Division 10 - Specialties.
Division 11 - Equipment, Laboratory Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents