Similar Projects
Infiltration and Tuckpointing at Schurz
Post-Bid
Chicago, IL 60641

Curtainwall Replacement at Lincoln MS
Post-Bid
Schiller Park, IL 60176

Maywood Fine Arts Exterior Remodeling
Results
Maywood, IL 60153

Housing Rehabilitation Program - Gutters, Downs, & Windows (Dominguez)
Renovation
Results
Rock Island, IL 61201

Replace Architectural Panels
Post-Bid
Less than $900,000 est. value
East Peoria, IL

Housing Rehabilitation Program - Steps, Window Wraps, Soffit, & Rain Cap (Martin)
Renovation
Results
Rock Island, IL 61201

2021 Wall Life Safety and Exterior Stairs
Post-Bid
Palatine, IL

Housing Rehabilitation Program - Porch, Ada Ramp, & Cellar Door (Garner-Wahe)
Renovation
Results
Rock Island, IL 61201

Public Works Building Exterior Improvements
Post-Bid
Glen Ellyn, IL 60137

Housing Rehabilitation Program - Roof, Gutters, Chimney, & Steps (Schweickhardt)
Renovation
Results
Rock Island, IL 61201

Miscellaneous Exterior Work - 2021
Post-Bid
Columbia, IL 62236

Housing Rehabilitation Program - Roof And Entry Door (Boege)
Renovation
Results
Rock Island, IL 61201

Hamlin Storefront Replacement
Post-Bid
Alsip, IL 60803

Housing Rehabilitation Program - Stabilize Front Room & Stoop (Schriner)
Renovation
Results
Rock Island, IL 61201

Museum Exterior Prepping and Painting
Post-Bid
Warrenville, IL 60555

Last Updated 06/15/2022 07:28 AM
Project Title

Scranton Avenue Underpass Steel Railing Repairs

Physical Address View project details and contacts
City, State (County) Lake Bluff, IL 60044   (Lake County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Steel
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected December 2022
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the repairs to the existing steel railing at the West Scranton Avenue underpass beneath the Union Pacific Railroad tracks and Sheridan Road. The existing railing is made of three-inch diameter steel tubing. The work includes the replacement of approximately 40 lineal feet of railing as well as replacing connection plates between the steel railing and concrete barrier below and installing steel sleeves where the splices between sections of tubing have failed.

Details

Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications, Metal Railings.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents