Similar Projects
Airport Site Development
Infrastructure
Conception
Gulfport, MS

Brantley Ellison Fitness / Biloxi
New Construction, Infrastructure
Conception
Biloxi, MS 39532

The Spargo at Oxford Commons
New Construction, Infrastructure - 25,000 SF
Design
$6,000,000 CJ est. value
Oxford, MS 38655

N. A. Sandifer Bridge Maintenance
Infrastructure
Design
$615,136 CJ est. value
Monticello, MS 39654

Pass Christian High School Track Replacement
Infrastructure
Bidding
$600,000 CJ est. value
Pass Christian, MS 39571

Diamondhead Dr. East Retention ( Miller) Pond and Lily Pond Dredging
Infrastructure
Bidding
$500,000 CJ est. value
Diamondhead, MS 39525

Resurrection Life Church / Picayunne
New Construction, Infrastructure - 52,448 SF
Sub-Bidding
$25,000,000 CJ est. value
Picayune, MS 39466

The Pearl Apartments at Oxford Commons
New Construction, Infrastructure - 173,139 SF
Sub-Bidding
$23,000,000 CJ est. value
Oxford, MS 38655

U.S. Highway 11 Utility Relocate Project - Phase II
Infrastructure
Results
$900,000 est. value
Picayune, MS 39466

Paving Construction on Various County Roads in District 2
Infrastructure
Results
$352,922 CJ est. value
Macon, MS 39341

Southeast Greene Water Authority - Water Main Project
Alteration
Construction
$900,262 est. value
Lucedale, MS

Murphy Oil #6892/7823 / Waveland
New Construction, Infrastructure - 1,400 SF
Construction
$2,000,000 CJ est. value
Waveland, MS 39520

Oneline Transportation Corridor Development - City of Jackson
Infrastructure
Conception
$10,000,000 CJ est. value
Jackson, MS 39217

Water Systems Improvement Project
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Ocean Springs, MS

Blues Park Walking Trail - Phase 1A
Infrastructure
Bidding
$200,000 CJ est. value
Tutwiler, MS 38963

Last Updated 01/26/2023 11:32 AM
Project Title

George Street Pipe Replacement

Physical Address View project details and contacts
City, State (County) Carrollton, MS 38917   (Carroll County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $117,939 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For George Street Pipe Replacement- Removal of Pipe Unclassified Excavation (FM) Crushed Stone, Size 610 Borrow Excavation (FME)(Contractor Fumished)(Class 9) Crushed Stone, Size 610 Hot Mix Asphalt, ST, 12.5MM (Overlay) Saw Cut, Full Depth 72" Aluminized Coated Metal Pipe Construction Stakes Geotextile Fabric, Type V, Headwall "A" (per plans) Headwall "B" (per plan Completion- 60 work days thereafter.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents