Similar Projects
Last Updated | 01/26/2023 11:32 AM |
Project Title | George Street Pipe Replacement |
Physical Address | View project details and contacts |
City, State (County) | Carrollton, MS 38917 (Carroll County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected February 2023 |
Bids Due | View project details and contacts |
Estimated Value | $117,939 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For George Street Pipe Replacement- Removal of Pipe Unclassified Excavation (FM) Crushed Stone, Size 610 Borrow Excavation (FME)(Contractor Fumished)(Class 9) Crushed Stone, Size 610 Hot Mix Asphalt, ST, 12.5MM (Overlay) Saw Cut, Full Depth 72" Aluminized Coated Metal Pipe Construction Stakes Geotextile Fabric, Type V, Headwall "A" (per plans) Headwall "B" (per plan Completion- 60 work days thereafter. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |