Similar Projects
Berwick Area YMCA
New Construction - 8,000 SF
Conception
$3,300,000 est. value
Berwick, PA 18603

Lancaster Host Resort - Expo Center Parking
New Construction
Design
Lancaster, PA 17602

Hopewell Township Park Walking Trail and Old Firehouse Parking Lots
Post-Bid
Newburg, PA 17240

Scott Park ADA Ramps and Sidewalk Improvements
Post-Bid
$38,390 est. value
Carnegie, PA 15106

Parking Lot Construction for Administration Building
Results
Latrobe, PA

CDBG Curb Cut Reconstruction Project - 2018 Pine Street (Parts I and II) and Chestnut Street (Parts III and IV)
Results
Berwick, PA

Eagle Village Parking Expansion
Addition
Construction
$100,000 est. value
Chester Springs, PA 19425

Greentree Industrial Park - Truck Parking
New Construction
Construction
Alburtis, PA 18011

Civic Center ADA Upgrades
Post-Bid
$46,425 est. value
Pittsburgh, PA 15227

Logan Avenue Streetscape
Results
Tyrone, PA 16686

Handicapped Parking and Infield Access Tunnel
Construction
Port Royal, PA 17082

ADA Improvement
Post-Bid
New Castle, PA

Concrete Sidewalk Repair
Results
$25,000 to $100,000 est. value
Johnstown, PA

Fawn Lake Parking Lot Project
Construction
PA

Francis Avenue Tree Removal and Sidewalk Installation Project
Post-Bid
Connellsville, PA 15425

Last Updated 10/24/2020 04:37 AM
Project Title

Hellertown Main Street Pedestrian

Physical Address View project details and contacts
City, State (County) Hellertown, PA 18055   (Northampton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $999,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the construction of pedestrian improvements including ADA ramps, crosswalks, pedestrian activated crossing lights and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 0412, Section 000, in Northampton County, Hellertown Borough from approximately Wagner Avenue at segment 0080 offset 2015 to approximately Saucon Street at segment 0060 offset 0817. 0203-0004 Cubic Yard 150.000 01 n c1 Class 1b Excavation 0212-0014 Square Yard 74.000 01 n c3, h, m2 Geotextile, Class 4, Type a 0313-0422 Square Yard 136.000 01 n e Superpave Asphalt Mixture Design, Base Course, Pg 64s-22, 0.3 To < 3 Million Esals, 25.0 Mm Mix, 4" Depth 0350-0108 Square Yard 136.000 01 n c, e Subbase 8" Depth (No. 2a) 0413-0245 Square Yard 1,265.000 01 n f Superpave Asphalt Mixture Design, Wearing Course, Pg 64s-22, 0.3 To < 3 Million Esals, 9.5 Mm Mix, 1 1/2" Depth, Srl-h 0413-6046 Square Yard 136.000 01 n f Superpave Asphalt Mixture Design, Binder Course, Pg 64s-22, 0.3 To < 3 Million Esals, 19.0 Mm Mix, 3" Depth 0460-0001 Square Yard 1,700.000 01 n f4 Asphalt Tack Coat 0491-0012 Square Yard 1,110.000 01 n f3 Milling Of Asphalt Pavement Surface, 1 1/2" Depth, Milled Material Retained By Contractor 0606-0150 Set 1.000 01 n c1, k Grade Adjustment Of Existing Manholes 0606-0160 Set 4.000 01 n c1, k Grade Adjustment Of Existing Water Valves 0606-0161 Set 1.000 01 n c1, k Grade Adjustment Of Existing Gas Valves 0606-0162 Set 1.000 01 n c1, k Grade Adjustment Of Existing Utility Boxes 0608-0001 Lump Sum 1.000 03 n x Mobilization 0609-0003 Lump Sum 1.000 02 n x Inspector`s Field Office And Inspection Facilities, Type b 0609-0009 Lump Sum 1.000 02 n x Std Equipment Package 0630-0001 Linear Foot 150.000 01 n k Plain Cement Concrete Curb 0630-0010 Linear Foot 580.000 01 n k Plain Cement Concrete Curb, Including Removal Of Existing Curb 4676-0001 Square Yard 370.000 01 n Req k Proj Cement Concrete Sidewalk 0686-0030 Lump Sum 1.000 01 n x Construction Surveying, Type b, Modified 0688-0002 Lump Sum 1.000 02 n x Microcomputer With Battery Backup System, Type a 0689-0001 Lump Sum 1.000 04 n x Narrative Schedule 0690-0001 Dollar 1,000.000 $1.00 $1,000.00 01 y x Internal Facilitation e 0695-0004 Square Foot 210.000 01 n k Detectable Warning Surface, Polymer Composite o 0695-0002 Square Foot 210.000 01 n k Detectable Warning Surface, Cast Iron o 0695-0003 Square Foot 210.000 01 n k Detectable Warning Surface, Polymer Concrete 0703-0025 Cubic Yard 56.000 01 n c1, h No. 57 Coarse Aggregate 0802-0003 Square Yard 60.000 01 n c1, m Topsoil Furnished And Placed 0804-0001 Pound 8.000 01 n m3 Seeding And Soil Supplements - Formula b, Including Mulch 0805-0025 Ton 0.030 01 n m3 Mulching - Pellet Mulch 0808-0130 Each 32.000 01 n m Plantings 0809-0002 1000 Gallons 2.000 01 n m Watering 0855-0003 Each 1.000 01 n m2 Pumped Water Filter Bag 0860-0000 Each 7.000 01 n m2 Inlet Filter Bag For Type m Inlet 0860-0002 Each 19.000 01 n m2 Inlet Filter Bag For Type c Inlet 0901-0001 Lump Sum 1.000 04 n q Proj Maintenance And Protection Of Traffic During Construction 0931-0001 Square Foot 100.000 01 n r Post Mounted Signs, Type b 0935-0001 Square Foot 310.000 01 n r Post Mounted Signs, Type f 0941-0001 Each 7.000 01 n r Reset Post Mounted Signs, Type b 0960-0005 Linear Foot 1,600.000 01 n o2 6" White Hot Thermoplastic Pavement Markings 0960-0036 Linear Foot 80.000 01 n o2 24" Yellow Hot Thermoplastic Transverse Pavement Markings 0962-1005 Linear Foot 2,300.000 01 n o 4" Yellow Waterborne Pavement Markings 0963-0004 Linear Foot 169.000 01 n o2, o3 4" Pavement Marking Removal 4965-1025 Square Foot 4,900.000 01 n Yes o2 Proj Preformed Thermoplastic Decorative Crosswalk, Type e, Maroon Pattern / White Grout , Herringbone Pattern 0971-0001 Each 14.000 01 n r Remove Post Mounted Signs, Type b 9000-0001 Square Yard 19.000 01 n k Proj Brick Paver Sidewalk 9000-0002 Each 20.000 01 n p Proj Solar Powered Rectangular Rapid Flashing Beacon Assembly 9000-0003 Each 1.000 01 n h1 Proj Pvc Pipe With Slotted Cover 9000-0004 Each 1.000 01 n r Std Covid-19 Safety Plan Sign 9000-0005 Cubic Yard 37.000 01 n m Proj Structural Soil 9000-0006 Lump Sum 1.000 01 n q Proj Pedestrian Detour Route 9000-0007 Each 2.000 01 n m Proj Plantings - Tree - Street 9000-0008 Square Yard 5.000 01 n k Proj Reinforced Concrete Bus Shelter Pad

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents