West Street Office and Warehouse Development
New Construction, Infrastructure - 30,000 SF
Design
$11,190,000 CJ est. value
Wichita, KS 67213

Milling and HMA Overlay
Infrastructure
Bidding
$3,000,000 CJ est. value
Valley Center, KS 67147

Milling and HMA Overlay
Infrastructure
Bidding
$3,000,000 CJ est. value
Valley Center, KS 67147

2022 Outsourced Pavement Preservation Program Joint and Crack Seal, Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Wichita, KS 67202

2022 Outsourced Pavement Preservation Program Joint and Crack Seal, Phase 2
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Wichita, KS 67202

Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

Airfield Paint & Rubber Removal Maintenance - Mcconnell AFB Fy21
Term Contract
Post-Bid
$100,000 to $250,000 est. value
McConnell AFB, KS

Paving of Canyon, Monterey, Monument, Monument Circle and Lynndale
Infrastructure
Results
Wichita, KS

Water Distribution System to serve Firefly Way Addition Phase 5
Infrastructure
Results
Wichita, KS

High Plains Development Seventeenth
Demolition, New Construction, Infrastructure
Pending Verification
$72,000,000 CJ est. value
Wichita, KS 67208

High Plains Development Seventeenth
Demolition, New Construction, Infrastructure
Pending Verification
$72,000,000 CJ est. value
Wichita, KS 67208

Field Renovation Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Wichita, KS 67209

Snow and Ice removal
Term Contract
Sub-Bidding
Wichita, KS 67202

Hoover Road Multi-Use Path Phase 1 (Hoover and Zoo Signalization)
Infrastructure
Post-Bid
Wichita, KS

2021 Pavement Rehabilitation
Infrastructure
Results
Derby, KS

Last Updated 08/16/2022 10:37 AM
Project Title

Blayke Court to Serve Cooper Creek Addition

Physical Address View project details and contacts
City, State (County) Wichita, KS 67202   (Sedgwick County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $181,940 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2022, project was awarded to APAC KANSAS INC, awarded amount is $181,939.60. For Blayke Court to Serve Cooper Creek Addition Note: bidder shall affix the following project number to the bid Envelope e2031 Attention all bidders: a bid bond in the amount of five percent (5%) Of the total bid or an annual bid bond is required prior to bid Opening. See section 102.3 of the city of wichita standard Specifications for further information. Bidders are advised to contact the office of the city engineer (316-268- 4501) should they have any questions or concerns about the plans, Special or supplemental provisions, minority status, or the proper Preparation of the bid document. The bid form shall be prepared using unit prices per bid item, unless Otherwise noted. Start Date. The work order on these projects shall be issued 20 (twenty) calendar days after the date on which the contract for these projects has been awarded to the successful bidder. Completion Date. The work on these projects shall be completed within 30 (thirty) working days from the date of beginning work for all projects and in accordance with the plans and Standard Specifications. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. The non-availability of material shall not prevent working days from being assessed. Completion Date. The work on these projects shall be completed within 30 (thirty) working days from the date of beginning

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents