Similar Projects
29 Wastewater Line Construction
Infrastructure
Bidding
$18,478,030 CJ est. value
San Antonio, TX 78205

Harmony School of Innovation - Sugar Land - Water Interconnect
Infrastructure
Bidding
$375,000 CJ est. value
Sugar Land, TX 77498

Water Well No. 2 Rehabilitation
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Sugar Land, TX 77498

Purchase of Lift Station 20 Pumps
Term Contract
Sub-Bidding
Port Isabel, TX 78578

Matagorda Ship Channel, Texas, Matagorda Peninsula to Point Comfort, Pipeline Dredging
Term Contract
Post-Bid
$50,000,000 CJ est. value
Galveston, TX 77553

Phillips Event Center Plumbing
Alteration
Post-Bid
Bryan, TX 77802

Plumbing System Maintenance and Related Services
Term Contract
Results
Los Fresnos, TX

Plumbing Services and Materials
Alteration
Results
$300,000 est. value
El Paso, TX

Beeline Drive Sewer Line Replacement
Infrastructure
Construction
$546,469 CJ est. value
Harker Heights, TX 76548

Trinity Ranch Phase 1 Section 3 Paving, Drainage, Water & Wastewater Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Flatonia, TX 78941

Plumbing Services
Term Contract
Post-Bid
Dallas, TX

Fox Fine Arts Center - Piping Replacement Project
Alteration
Results
El Paso, TX 79902

Plumbing Maintenance and Repair Services
Alteration
Post-Bid
Odessa, TX

Plumbing Services District-Wide
Term Contract
Results
Brownsville, TX

Telford Unit - Replace Hot Water and Steam Piping
Alteration
Post-Bid
New Boston, TX 75570

Last Updated 04/02/2023 11:40 PM
Project Title

2022 Water Plant Improvements

Physical Address View project details and contacts
City, State (County) Angleton, TX 77515   (Brazoria County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $401,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located at various plants within the water system. Water Plant No. 1 is located at 3700 Northfork Drive, Pearland, Texas 77584. Water Plant No. 2 is located at 3110 Morgan Road, Pearland, Texas 77584. Water Plant No. 3 is located at 3006 Summercrest Drive, Pearland, Texas 77584. Water Plant No. 4 is located at 3133 1/2 County Road 922, Pearland, Texas 77584. For construction contracts $50,000 and over but less than $250,000, the bidder shall submit a certified or cashier's check on a responsible bank in the State equal to two percent (2%) cashier's check or five percent (5%) bid bond of the maximum total bid amount. For construction contracts over $250,000, the bidder shall submit either a 2% certified or cashier's check or a five percent (5%) bid bond of the maximum total bid amount. Make the cashier's check or bid bonds payable to the Owner. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter. The Owner reserves the right to reject any or all bids and waive any or all irregularities. No bid may be withdrawn until the expiration of 60 calendar days from the date bids are open The deadline to ask questions is 2/21/2023 10:00 AM CST

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents