Similar Projects
Installation of a Metal Roof on at the Water Treatment Plant Building
Renovation
Design
Blytheville, AR 72315

Elementary School Roof Replacement
Renovation
Sub-Bidding
$575,000 CJ est. value
Hampton, AR 71744

Reroof Portions of the Flat Roof of Building 80 at the Arkansas Health Center
Alteration
Post-Bid
Benton, Little Rock, AR 72015

Reroof Portions of the Flat Roof of Building 80 at the Arkansas Health Center
Alteration
Post-Bid
Benton, Little Rock, AR 72015

Joe Martin Health Sciences Roof Replacement
Alteration
Results
Pocahontas, AR 72455

Roof Bid
Alteration
Results
Berryville, AR 72616

Roofing Bids: 4-5 Buildings
Renovation
Construction
$57,835 CJ est. value
Beebe, AR 72012

Reroof Jefferson Elementary
Alteration
Post-Bid
Little Rock, AR 72207

Arkansas Tech University McEver Hall Roof Replacement
Alteration
Results
$400,000 est. value
Russellville, AR 72801

Roofing Project at Crater of Diamonds State Park
Alteration
Post-Bid
$300,000 est. value
Murfreesboro, AR 71958

Sealing of Metal Roof
Alteration
Results
$200,000 est. value
Hope, AR 71801

Dunbar Middle School Roof Replacement
Alteration
Post-Bid
Little Rock, AR 72206

Installation of Metal Roof
Alteration
Results
$200,000 est. value
Hope, AR 71801

Ashley County Detention Facility Roof Overlay
Alteration
Post-Bid
Hamburg, AR

Drake Field T-Hangar Roof Rehabilitation
Alteration
Results
$200,000 est. value
Fayetteville, AR 72701

Last Updated 08/28/2023 12:14 PM
Project Title

Warren Municipal Building Roof

Physical Address View project details and contacts
City, State (County) Warren, AR 71671   (Bradley County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description The contractor will provide all necessary material, labor, supervision, equipment, and related work to complete the project in a safe and timely manner. Begin construction project by prepping existing roof system to be overlayed with new Duro-Last PVC roof system. Install a Duro-Last Duro Weaver slip sheet. . Mechanically attach Duro-Last 60 mil Dura-Tuff PVC Membrane Install 2-Piece Compression Metal- in place of existing metal coping cap. lean-up and haul off all waste into on-site dumpster. New roof system to receive a 25-year NDL Manufacturer's Warranty from Dura-Last. Will furnish a 2-year workmanship guarantee from RBT Construction. Warren Municipal Building Roof

Details

5,916 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents