Similar Projects
Up Clear Creek Project
Infrastructure
Bidding
Denver, CO

Filing 34 Central Park Station Plaza
Infrastructure
Post-Bid
Denver, CO

Ft Morgan Poe Scale Pit Drain
Infrastructure
Post-Bid
$30,000 est. value
Denver, CO

Clarkson Pump Station
Results
Denver, CO 80204

Nine-Mile Driver Relief Station Replacement
Results
Denver, CO

Construction of Filing 40th Avenue Extension
Infrastructure
Post-Bid
Denver, CO 80238

Grays Peak General Storm
Results
$4,400,000 to $4,800,000 est. value
Denver, CO

Ledge Rock Center Public Improvements
Infrastructure
Post-Bid
CO

NW and SW Aquatic Habitat Design-Build Projects
Results
Less than $350,000 est. value
Denver, CO

R2 Culvert Corrugated Metal Piping
Infrastructure
Post-Bid
CO

CTF TCF Water Pump Skid Repl. Dq1 GC CMS165046
Results
Less than $60,000 est. value

R2 Fay's Crossing Flood Control Lift Station
Renovation
Post-Bid
Denver, CO

CTF ECCPC South Pump Station Roof DQ1 GC CMS164761
Renovation
Results
$150,000 est. value
Gunnison, CO 81230

66th - 68th Avenue and Denali Project
Infrastructure
Post-Bid
Denver, CO 80238

Removal of Portions of Present Structure, Removal of Fence and Facing Block
Results
Denver, CO 80239

Reported 04/09/2022 12:00 AM
Project Title

Majestic Commerce Center Pump House

Physical Address View project details and contacts
City, State (County) Denver, CO 80249   (Denver County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of: Construction of common area roadways, utilities, and drainage improvements for the 3 building Phase 11 project on and around the 93.6 acres site north of 32nd Parkway and east of Himalaya Road, in the Majestic Commerce center, all being within the boundaries of the District.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Steel Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents