Similar Projects
On-Call/Emergency Services
Post-Bid
Marana, AZ 85653

DEMA SBAH Bldg L4535 Chiller Replacement (M20-0012) Single
Post-Bid
Marana, AZ

VA Tucson Replace AHUs for Critical Care and Sterile Processing
Results
$2,000,000 to $5,000,000 est. value
Tucson, AZ 85723

Safford K-8 School Boiler and Chiller Replacement
Results
Less than $604,872 est. value
Tucson, AZ 85701

VA Tucson Replace Air Distribution Systems - Building 57
Post-Bid
Tucson, AZ

Dunham Elementary School Chiller Replacement
Term Contract
Results
Less than $539,465 est. value
Tucson, AZ 85748

DEMA HVAC Duct Repair L4605 Silverbell Single
Post-Bid
Marana, AZ 85653

Cavett, Manzo and Wheeler Elementary Schools Kitchen A/C Conversion
Term Contract
Results
$250,000 to $300,000 est. value
Tucson, AZ 85745

Robert Naylor K-8 School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85711

Dema HVAC Replacement Classroom Area L4300 (M20-0007) Single
Results
Marana, AZ 85653

Utterback Middle School Kitchen A/C Conversion
Post-Bid
Tucson, AZ 85713

Pistor Middle School Chiller Replacement
Term Contract
Results
Tucson, AZ 85746

Oyama Elementary School Chiller Replacement Project
Post-Bid
Tucson, AZ 85713

Dema Sbah Bldg L4535 Chiller Replacement
Results
Marana, AZ 85653

HVAC Replacement Agua Caliente Elementary School
Post-Bid
Tucson, AZ 85749

Last Updated 04/21/2021 04:00 PM
Project Title

45--Saguaro National Park Requires The Replacement of HVAC

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85748   (Pima County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of existing Heating, Ventilation, and Air conditioning (HVAC) system at the SAGU Fire Heli-Base. Existing system is comprised of split type, air cooled heat pump with auxiliary electric coil and air-cooled air conditioner. This system has exceeded its design life. This project replaces existing equipment with higher efficiency equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents