Similar Projects
Day Care
Renovation - 8,504 SF
Conception
Bridgeport, CT 06606

Head Start
Renovation - 7,466 SF
Design
$1,700,000 est. value
North Haven, CT

Post Road Daycare
Renovation
Pending Verification
Fairfield, CT

The Learning Experience
Renovation - 10,000 SF
Design
Hartford, CT

Wesleyan Neighborhood Preschool
Renovation - 15,000 SF
Construction
Middletown, CT 06457

Ansonia Early Care and Education Center
Renovation
Post-Bid
Ansonia, CT 06401

Offutt Center at Lachat Farm
New Construction - 1,193 SF
Conception
Weston, CT 06883

Daycare
Renovation - 11,580 SF
Design
Enfield, CT 06082

New YMCA Day Care Facilities
New Construction
Results
Berlin, CT 06037

The Learning Experience
New Construction - 10,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Enfield, CT 06082

The Learning Experience
New Construction - 10,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
South Windsor, CT 06074

Discovery Basement Renovation and Elevator Addition
Renovation
Results
Hartford, Wethersfield, CT 06109

The Bristol Child Care Center
Renovation - 4,500 SF
Construction
$469,330 est. value
Bristol, CT 06010

Last Updated 02/07/2022 02:28 PM
Project Title

Head Start Build Out Project

Physical Address View project details and contacts
City, State (County) Hartford, CT   (Hartford County)
Category(s) Education
Sub-Category(s) Pre-School/Daycare
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is a change of use, converting approx. 11,000 s.f. of the recently renovated historic 2 story Swift Factory space to a new Federally Funded Head Start Program Facility. Project includes interior fit out for day care rooms, offices break rooms and toilet facilities. Project is to be sprinklered, new electric to be pulled from recently installed meter and distribution equipment. New rooftop equipment is to supply ducted conditions air throughout the daycare portion of the facility. 2 conjoined Exterior playgrounds and sidewalks are to be provided to the Swift Factory, located at 10 Love lane, Hartford, CT., 06112. The scope of work shall include, but is not limited to, management and execution of: site, civil, demolition, concrete, masonry, electrical, plumbing, record keeping, coordination of trades, special inspections, schedule adherence, shop drawing and close out document turnover.

Details

1 Pre-School/Daycare, 2 Stories Above Grade, Approximately 11,000 SF Build-Out.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents