Similar Projects
Holmes Road Improvements, Blue Ridge Boulevard to 137th Street - 89008543 - City of Kansas City
Infrastructure
Conception
$500,000 est. value
Kansas City, MO 64121

Mace Road Sidewalks - City of Kansas City
Infrastructure
Conception
$260,000 est. value
Kansas City, MO 64152

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

Uptown Lofts Part Two / Kansas City
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Kansas City, MO 64111

Microsurface Designated Streets
Infrastructure
Bidding
$3,194,358 CJ est. value
Kansas City, MO 64106

Microsurface Designated Streets
Infrastructure
Bidding
$3,194,358 CJ est. value
Kansas City, MO 64106

Asphaltic Paving and Striping of City Hall Parking Lot
Infrastructure
Post-Bid
Greenwood, MO 64034

Demolition of 1308 West Main Street
Infrastructure
Post-Bid
Blue Springs, MO 64015

2021 Shalimar Park Field Grading
Infrastructure
Results
Grandview, MO 64030

Kansas City Streetcar Special Trackwork
Infrastructure
Results
Kansas City, MO 64121

AC Rialto Hotel
Renovation, Infrastructure - 169,000 SF
Construction
$65,700,000 CJ est. value
Kansas City, MO 64106

D/B-Design Build Services for a New Detention Center Facility
LEED Certification, New Construction, Infrastructure
Construction
$256,500,000 CJ est. value
Kansas City, MO 64133

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Take 5 Oil Change / Blue Springs
New Construction, Infrastructure - 1,415 SF
Pending Verification
$350,000 CJ est. value
Blue Springs, MO 64015

Longview Tract by The Bay Water Park - City of Kansas City
Infrastructure
Conception
$315,000 est. value
Kansas City, MO 64134

Last Updated 01/10/2023 04:35 AM
Project Title

Bridge Replacement

Physical Address View project details and contacts
City, State (County) Grain Valley, MO 64029   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $6,997,030 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J4I3288 Route I-70 JACKSON County. Bridge replacement at Route AA and Route BB, 4 miles east of Route 7 in Grain Valley, the total length of improvement being 0.472 miles. Range: 5M to 7.5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of Missouri, acting by and Through the Missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - C02 - Bridge Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions concerning the bid document preparation shall be directed to the Central Office - Design Division at (573) 751-2876. Project specific questions shall be directed to the project contact listed in the Job Special Provisions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents