Similar Projects
Honeybee Discovery Center
New Construction
Conception
Orland, CA 95963

Sienna Pointe and Heackock Park Apartment Complexes Renovation
Renovation
Conception
$10,000,000 est. value
Moreno Valley, CA 92553

Ocean Avenue Mixed Use Development
New Construction - 72,000 SF
Design
$20,000,000 est. value
Santa Monica, CA 90401

Rot Room Flooring
Renovation
Design
$300,000 CJ est. value
Los Angeles, CA 90037

YOSE 228193, 228205, 228214 - Tuolumne Meadows Electric Distribution Replacement
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Tuolumne, CA 95379

YOSE 228193, 228205, 228214 - Tuolumne Meadows Electric Distribution Replacement
Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Tuolumne, CA 95379

Install Security Fencing for Whiskeytown Whiskeytown National Recreation Area
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Whiskeytown, CA 96095

Pine Lodge Plaster Ceiling Replacement
Renovation
Sub-Bidding
$2,510,690 CJ est. value
Tahoma, CA 96142

Southeastern Live Well Center
New Construction - 65,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
San Diego, CA 92114

Modesto Junior College East Campus Outdoor Weightlifting Shade Structure and Associated Site Work
Renovation - 1,800 SF
Post-Bid
$150,000 est. value
Modesto, CA 95350

Shade Structures at 6 Sites
New Construction
Results
Modesto, CA 95357

Sport Field Renovations - Olive Middle School Soccer And Baseball Fields
Renovation
Results
$850,000 est. value
Baldwin Park, CA 91706

Intuit Dome (Los Angeles Clippers Arena)
New Construction - 1,071,000 SF
Construction
$1,800,000,000 est. value
Inglewood, CA 90304

Vistas at Glendora
New Construction - 107,980 SF
Construction
$10,000,000 CJ est. value
Glendora, CA 91740

Media Park Revitalization
Renovation, Alteration
Pending Verification
Culver City, CA 90232

Last Updated 08/12/2022 10:32 AM
Project Title

Replace Air Conditioner Compressor and Recharge System Servicing Elevator Controls Room

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94109   (San Francisco County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational, Museum
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION A. The work specified herein consists of replacing a failed air conditioner compressor and recharging the system which services the elevator controls room in the Maritime Museum. Work is to be performed by a Contractor licensed in the State of California. 1.02 LOCATION A. The worksite is located at the San Francisco Maritime Museum complex, 900 Beach Street, San Francisco, California. 1.03 GENERAL CONDITIONS AND INFORMATION A. The Maritime Museum building is owned by the Department of Interior, National Park Service, herein after called NPS, and is maintained by the San Francisco Maritime National Historical Park, (SAFR). B. Any particulars described for the work involved is given for guidance to the Contractor, however, the Contractor is to take his own measurements, dimensions and counts, and is responsible for the same. C. All work described in this specification is for replacing and charging the air conditioner servicing the elevator controls room in the Maritime Museum. All work shall be accomplished in accordance with the provisions of the NPS Contract and Scope of Work. Additional work that will result in additional cost shall be carried out only when authorized in writing by the Contracting Officer. D. The Contractor shall be responsible for removing and disposing of any debris from the work area at the Museum Building utility room by the Contractor during the workday. F. The Contractor shall immediately notify the Contracting Officer of any ambiguities, inconsistencies and errors discovered in this specification or between contracting documents and existing conditions. SPECIAL WORK REQUIREMENTS A. This service will be being conducted within a National Park, which will open daily, that requires activities to be carefully coordinated with the Contracting Officer as follows: 2 o Contractor shall at all times conduct his operations to ensure the inconvenience to park visitors and employees who work within the area are at a minimum. o Confine storage of materials to area designated by Contracting Officer. o Store materials in accordance with manufacturer's instructions, with seals and labels intact and legible. o Contractor is encouraged to obtain materials in biodegradable or recyclable/reusable packaging. o Remove from the area daily all oily rags, waste and other combustibles not in a covered metal container/ s from the area daily to prevent fire hazard. o Ensure that all surfaces contacted by effluent as a result of this work as well as contact by Contractor's equipment and supplies are cleaned and sanitized as needed. Some wells will require extended lengths of hose to access wells. Areas traversed include (but not limited to) carpet, linoleum, concrete and tile. Any visible traces of effluent must be addressed by Contractor REPLACE AIR CONDITIONER COMPRESSOR AND RECHARGE SYSTEM SERVICING ELEVATOR CONTROLS ROOM AT SAN FRANCISCO MARITIME NHP (SAFR)" The work specified in the Scope of Work (SOW) consists of replacing a failed air conditioner compressor and re-charging the system which services the elevator controls room in the Maritime Museum. Work is to be performed by a Contractor licensed in the State of California. Per the requirements of FAR 36.204, the project range is estimated to be Less Than $25,000.00. The North American Industry Classification System (NAICS) Code for this requirement is 238210 - Electrical Contractors and Other Wiring Installation Contractors, with a corresponding Size Standard of $16.5 million in annual gross receipts for the past three years. This acquisition is a Total Small Business set-aside. All responsible sources with Small Business status may submit a quotation which, if timely received, will be considered. Offers received from concerns that are not Small Business concerns shall be considered nonresponsive and will be rejected. The Government intends to award a single, Firm-Fixed-Price contract. Award selection will be made on a Best Value basis after consideration of price and factors other than price (Technical Capability, CA Contractor License and Past Performance) as listed in the Request For Quotation (RFQ)/Solicitation. See Terms and Conditions (Contract Clauses), Section M, for the Evaluation Factors for Award. Interested contractors are highly encouraged to conduct a site visit, per FAR 36.523. Site Visit is scheduled on August 9, 2022 at 10:00 AM (PD). Meet-up location: San Francisco Maritime Museum complex, 900 Beach Street, San Francisco CA. To confirm your attendance, please contact Micah Wright at 415-859-0898 or email: micah_wright@nps.gov. COVID-19 PUBLIC HEALTH INFORMATION: All attendees of site visit are requested to adhere to social distancing guidelines as recommended by Centers for Disease Control and Prevention (CDC) at cdc.gov and conform to all current local government and NPS regulations. Participants must provide their own personal protective equipment including facial coverings. SAFETY AND HEALTH PLAN: Work performed under this contract shall comply with applicable federal, state, and local safety and occupational health laws and regulations, including adherence to any local government health orders in effect to reduce the rate of transmission of Novel Coronavirus Disease 2019 (COVID-19). This includes but is not limited to Occupational Safety and Health Administration (OSHA) standards, 29 CFR, Part 1910 and Part 1926. Where the requirement of applicable laws, criteria, ordinances, regulation, and referenced documents vary the most stringent requirements shall apply. See the Scope of Work (SOW), Terms and Conditions (Contract Clauses), and all attachments to this RFQ/Solicitation for information and requirements. ALL QUESTIONS, REQUEST FOR INFORMATION AND/OR CLARIFICATION are DUE on Wednesday, August 10, 2022 at 3:00 PM (PD). REQUEST FOR QUOTATION (RFQ) MUST BE RECEIVED BY: 3:00 PM (PD), Monday, August 15, 2022, and shall only be accepted through electronic mail addressed to Michael Gabriel, email: michael_gabriel@nps.gov. NOTE: The Period of Performance (POP) might change before the contract award. Delivery: 12/31/2022 Delivery Location Code: 0009060632 NPS, San Francisco Maritime NHP Fort Mason Center, Building E San Francisco CA 94123 US

Details

Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents