Similar Projects
Caulks Creek Pump Station B (P-751) Generator Installation (IR)
Alteration
Bidding
$174,000 est. value
Chesterfield, MO 63017

Clinton Peabody Emergency Lighting Repairs
Alteration
Bidding
Saint Louis, MO 63104

E-F Phase II and III Construction
Post-Bid
Independence, MO

Hubbell Led Troffers Lighting
Post-Bid
Saint Louis, MO

Electrical Services
Term Contract
Results
Columbia, MO

High Voltage Electrical Services
Results
$100,000 est. value
Jefferson City, MO

Replace Emergency Generator, Power Plant
Alteration
Bidding
Mineral Point, MO 63660

Henry County Electrical Improvements - Summer 2021
Post-Bid
Windsor, MO

Solar Array, Interior Lighting and Roof Replacement-Trenton Field Maintenance Shop and Readines
Results
Trenton, MO 64683

Electric Motor Repairs
Term Contract, Alteration
Bidding
Gretna, MO

Led Mongoose Luminaires
Post-Bid
MO

Led Light Pole Fixtures
Results
Ballwin, MO

Inspection and Repairs of Breakers and Relays
Alteration
Bidding
Columbia, MO 65201

Led Cobra Luminaires
Post-Bid
MO

Wood Hall Ceiling and Lighting Replacement
Alteration
Results
Warrensburg, MO

Last Updated 07/16/2021 10:31 PM
Project Title

Campground Electrical Upgrade

Physical Address View project details and contacts
City, State (County) Smithville, MO 64089   (Clay County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will increase the electrical capacity of the northwest main breaker to accommodate 31 campsites with 50-amp, 30-amp, 20-amp capacity. Each campsite shall have one 50-amp receptacle on one 50 double pole breaker, one 30-amp receptacle on one 30-amp single pole breaker and one 20-amp duplex GFI receptacle on one single pole breaker. The project will need two new 400-amp bolt-in main breaker panels will be added on a pad to a new uni-strut. New copper wire will be used with each campsite being served on a dedicated line. All wire will be trenched at least 24 inches deep and be placed in conduit. All wiring should be in accordance with NFPA standards and up to 2012 Building Codes.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents