Similar Projects
Stormwater Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Poplar Bluff, MO 63901

New Nutritional Center
New Construction, Infrastructure
Bidding
$280,500 CJ est. value
Harviell, MO 63945

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Bridge Washing on I-70 and Route
Infrastructure
Results
$250,000 to $500,000 est. value

ADA Improvements
Infrastructure
Results
$50,000 to $100,000 est. value

New Hope Assisted Living / Poplar Bluff
New Construction, Infrastructure
Pending Verification
$976,000 CJ est. value
Poplar Bluff, MO 63901

True Manufacturing / Popular Bluff
Addition, New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Poplar Bluff, MO 63901

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Results
$250,000 to $500,000 est. value

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Asphalt Pavement Repairs at Various Locations on I-55, I-57, and I-155 in the SE District
Infrastructure
Results
$100,000 to $250,000 est. value

Williamsville Street and Drainage
Infrastructure
Post-Bid
$150,000 CJ est. value
Poplar Bluff, MO 63901

Intersection Improvement at Various Locations in the SE District
Infrastructure
Results
$1,000,000 to $2,500,000 est. value

Poplar Bluff Industrial Park Infrastructure Improvements
Infrastructure
Results
$1,000,000 est. value
Poplar Bluff, MO 63901

Last Updated 08/29/2022 01:07 PM
Project Title

Shelby Road Phase II Improvements

Physical Address View project details and contacts
City, State (County) Poplar Bluff, MO 63901   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $252,106 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Traffic Control, Roadway Pavement Markings, Pavement - Marking, Paving (Asphalt or Concrete), Asphalt Overlay, Rehab. and/or Maint. Description: Paving a portion of Shelby Road Phase II between the existing walk trail and Shelby Road, installing channelizes to delineate pedestrian and vehicle traffic and the placement of rumble strips along Shelby Road Phase II

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents