Similar Projects
RFP Design - Perry DDA Downtown Lot
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Perry, GA 31069

Luella Storage
New Construction, Infrastructure
Conception
$9,000,000 est. value
Locust Grove, GA 30248

Rowen Phase 1 Roads and Infrastructure
Infrastructure
Design
$18,000,000 est. value
Dacula, GA

Canal Road Widening Project FY22
Infrastructure
Design
$500,000 CJ est. value
Brunswick, GA 31525

Urban Pathway Phase 1 Re-bid
Infrastructure
Bidding
$795,361 CJ est. value
Fitzgerald, GA 31750

RFQ D/B - Construct ACS Weapons System Facility
New Construction, Infrastructure - 3,000 SF
Bidding
$5,000,000 CJ est. value
Savannah, GA 31408

Cable Barriers Upgrade
Infrastructure
Sub-Bidding
$600,000 CJ est. value
Savannah, GA 31406

Striping and Marking Project
Infrastructure
Sub-Bidding
$195,000 CJ est. value
Albany, GA 31701

Electric Utility Right-Of-Way Clearing
Term Contract
Post-Bid
Covington, GA

Site Preparation and Restoration for Portable Classrooms and Miscellaneous Paving or Patching
Post-Bid
Atlanta, GA 30339

Fender Road - Grading, Drainage, Base and Paving
Results
GA 31601

Rough Grading of Raymond Tract - Phase 2
Infrastructure
Results
Waynesboro, GA

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Athens Retail Infrastructure And R.O.W. Site Development
Infrastructure
Construction
Athens, GA 30606

RFP Phase I Grading - Rivian Automotive East Atlanta Megasite / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Pending Verification
$100,000,000 CJ est. value
Social Circle, GA 30025

Last Updated 07/28/2022 11:31 AM
Project Title

RFQ Contractor - Newnan Utilities Spillway Replacement for Reservoir Number 1 Dam

Physical Address View project details and contacts
City, State (County) Newnan, GA 30263   (Coweta County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Coweta County, Georgia Newnan Utilities (Owner) is soliciting Pre-Qualification from experienced Contractors that are interested in providing the required materials, labor, tools, and equipment for the work necessary to construct the spillway replacement associated with the Newnan Utilities Reservoir Number 1 Dam. All requests for a copy of the Invitation for Pre-qualification of Bidders requirements, and all questions regarding the invitation, should be submitted in writing to Brett W. Dodd, PE, Schnabel Engineering, LLC by e-mail at bdodd@schnabel-eng.com. The project generally consists of the following: Demolition of existing concrete spillway Construction of a reinforced-concrete chute spillway Installation of an Obermeyer hinged crest gate Construction of drainage system beneath the chute spillway Identifying, hauling, placing, and compacting structural fill Implementing and managing erosion, sedimentation, and pollution control Implementing and managing surface and ground water control measures Permanent stabilization of disturbed areas PRE-QUALIFICATION of Bidders for this project is required by the Owner. Only those Contractors that can demonstrate to the Owner and Engineer (Schnabel Engineering, LLC) that they have the experience and financial capability to successfully perform the work will be considered qualified to bid on the project. In order for the Owner and the Engineer to determine whether or not a Contractor is qualified to bid on the work, information described in the Invitation for Pre-Qualification of Bidders must be submitted by the date specified. The Owner intends to award a single contract for all work required on the project. Solicitation of bids for the project is anticipated to occur in Fall 2022. Only Those Contractors That the Owner Determines to Be Qualified to Perform the Work Through the Pre-qualification Process Will Be Invited to Submit a Bid for the Proposed Project. The Owner reserves the right to reject any and all submissions, to waive technicalities, and to make a decision deemed in their best interest.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents