Similar Projects
Newton School Parking Lot Improvments
Infrastructure
Bidding
$46,000 est. value
Greenfield, MA 01301

Sidewalk and ADA Improvements at Various Locations
Results
Less than $563,975 est. value

Sidewalk and ADA Improvements (including Signals) at Various Location
Results
Less than $633,280 est. value

Sidewalk and ADA Improvements and Related Work at Various Locations
Results
Less than $83,000 est. value

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,435,682 est. value

Pedestrian and Bicycle Improvements at Various Locations
Results
Less than $1,914,980 est. value

Turners Falls High School Sidewalk Replacement
Results
Turners Falls, MA 01351

Complete Streets Improvements
Results
Less than $125,000 est. value
South Deerfield, MA

Sidewalk and ADA Improvements and Related Work at Various Locations
Results
Less than $841,030 est. value

South End Parking Area Paving, Elm Terrace 667-2
Results
Less than $20,000 est. value
Greenfield, MA 01301

Sidewalk and ADA Improvements at Various Locations
Results
Less than $1,148,661 est. value

Lake Wallace Sensory Trail
Results
$142,000 est. value
Greenfield, MA

Western Ma Road and Trail Improvements
Results
$4,000,000 est. value
Franklin, Hampden, Worcester, MA

Reconstruction of Parking Lot and Sidewalk
Results
Orange, MA

Colrain Street Sidewalk Replacement and ADA Improvements
Results
$170,000 est. value
Greenfield, MA 01301

Last Updated 06/30/2021 10:06 AM
Project Title

Hope Street Sidewalk Replacement

Physical Address View project details and contacts
City, State (County) Greenfield, MA 01301   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the demolition and disposal of existing asphalt/concrete sidewalk; the construction of approximately 1,216 L.F. of new concrete sidewalk; installation of ADA compliant handicapped ramps; construction of approximately 402 L.F. of asphalt sidewalk; installation of approximately 860 L.F. of asphalt berm; and related work on the west side of Hope Street from Russell Street to #212.

Details

Division 02 - Existing Conditions, Demolition.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents