Similar Projects
Electrical Repair Work
Post-Bid
Albany, NY 12207

Standby Generator Installation - General Construction Minor Maintenance Contract
Post-Bid

Replace 15Kv Cables, Loop #3 South 3B1 - 3B2 @ WVA
Results
$500,000 to $1,000,000 est. value
Watervliet, NY

Preventative Maintenance and Emergency Service for Generator at Shaker Place Rehabilitation and Nursing Center
Results
Albany, NY 12207

Furnish and Deliver Lamps and Replacement Lamp shades
Term Contract
Post-Bid
Albany, NY 12207

Job Order Contracting - Area 7
Results
$500,000 to $1,000,000 est. value

Large Scale Renewables
Post-Bid

Flowmeter Controllers and Transducers to the Albany County Water Purification District
Term Contract
Results
Albany, NY 12207

Transient Voltage Surge Suppression System Installation
Term Contract
Post-Bid
Albany, NY 12205

Provide Natural Gas Standby Generator - Joint Forces Headquarters
Term Contract
Results
$1,000,000 to $2,000,000 est. value
Latham, NY 12110

Led Price Sign Fabrication & Installation At Twenty-Four (24) Lna Service Stations
Post-Bid

LED Lights
Results
Albany, Buffalo, Syracuse, NY

2020 Pole Replacement
Post-Bid
Green Island, NY 12183

Generator Replacement
Results
Albany, NY 12202

3 Year Holiday Lighting Installation and Removal
Term Contract
Post-Bid
Albany, NY 12207

Reported 10/15/2021 12:00 AM
Project Title

2021 Pole Replacement Project

Physical Address View project details and contacts
City, State (County) Albany, Green Island, NY 12204   (Albany County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pole Locations: Swan Street – Pole 9 Albany Avenue – Pole 5A Albany Avenue – Pole 3 Contractor will supply all labor and equipment Contractor will supply a list of materials needed, 4 to 6 weeks prior to start of work, must include what type of material is needed for backfill Contractor is responsible for picking up all materials @ 50 Cohoes Avenue, and delivering to job site Contractor is responsible for all traffic controls and safety procedures Contractor must notify GIPA if an outage is needed, to provide adequate time to customers (must give notice before disconnecting power) Contractor is responsible to bring all old materials / debris to 50 Cohoes Avenue GIPA is responsible for properly disposing / recycling all used materials GIPA will supply all materials

Details

Division 26 - Electrical.
Division 33 - Utilities, Communications Structures, Communications Utility Poles.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents