Similar Projects
KR Harrington Water Treatment Plant Filter Supplies
Term Contract
Design
Nashville, TN 37214

Caterpillar Construction Equipment Parts and Repair Services
Term Contract
Sub-Bidding
Nashville, TN 37219

Fountain and Aerator Parts and Repair Services
Term Contract
Sub-Bidding
Nashville, TN 37219

Intrusion Alarm Systems
Term Contract
Post-Bid
Nashville, TN

Architectural Services
Term Contract, Alteration
Post-Bid
Nashville, TN

Blue Oval City Water and Wastewater Facilities Management, Operation and Maintenance Services
Term Contract
Sub-Bidding
Nashville, TN 37219

Roofing Service and Repair
Term Contract, Alteration
Post-Bid
Less than $25,000 est. value
Nashville, TN

Repair and Maintenance Grounds Equipment
Term Contract
Sub-Bidding
Nashville, TN 37219

Painting Vacant Units at Kirkpatrick Park
Alteration
Post-Bid
Nashville, TN 37206

Wastewater Treatment Testing at Bledsoe County Correctional Complex
Term Contract
Post-Bid
Nashville, Pikeville, TN 37367

Sidewalk Construction and Maintenance Services
Infrastructure
Post-Bid
Nashville, TN

Landscape Maintenance at Cumberland View Apartments
Alteration
Post-Bid
Nashville, TN 37208

Pest Control Services
Term Contract
Post-Bid
TN

TWRA Portable Toilet Rental and Service
Term Contract
Post-Bid
Nashville, TN

IDIQ MATOC for Land-Based Civil Work Construction Projects
Term Contract
Post-Bid
$250,000,000 CJ est. value
Nashville, TN 37219

Last Updated 04/12/2023 02:03 AM
Project Title

Provide Engine Helicopter Parts, Engine Repairs and Engine Overhauls

Physical Address View project details and contacts
City, State (County) Nashville, TN 37219   (Davidson County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope Details Replacement of Engine Components While performing any job under contract, Contractor shall (1) perform any repairs necessary to enable an engine or an engine component to perform in accordance with Manufacturer's specification for a new engine and (2) replace any parts which are defective or which, according to the Manufacturer's specifications or recommendations, should be replaced at the time Contractor is performing the job. Special Requirement for testing of engine Any engine, which the Contractor overhauls pursuant to this contract, shall be tested by running on a certified test stand prior to return to Metro. This test run shall be performed for the period of time that is recommended in the Rolls Royce 250-C20 Serie Operation and Maintenance Manual #10W2. During the test run, the engine must perform full in accordance with the specifications promulgated by the Manufacturer for a new engine. If the engine fails the test run, Contractor shall correct the malfunction at no additional cost and repeat the test run procedure until the engine has passed the test. Engine Transport Contractor shall be responsible for all transport of engines and engine components to and from the Metro Nashville Police Department, Aviation Division, 2715-B Tucker Road, Nashville, TN 37218. Contractor may meet this responsibility by: (1) Contractor transporting the engine/components to and from the Metro Aviation; (2) overhauling and maintaining to engine/components in a mobile unit at Metro Police Aviation; or (3) designating a common carrier which will transport the engine and engine components to and from Metro Nashville Police Department, Aviation Section. Damage in Transport/Insurance When any engine and engine component is taken into possession by the Contractor or of a common carrier for transport, risk of loss shall be with the Contractor. Contractor shall provide for insurance in the amount of the Manufacturer's list price for all engines and engine components, which are transported by either the Contractor or by common carrier. Certifications Contractor warrants that the Manufacturer authorizes him to perform overhaul and maintenance services on the engines/components specified. Contractor shall allow only skilled mechanics, which have been trained and certified by the Manufacturer, to perform overhaul and maintenance services under this contract. Contractor shall observe the highest standard of diligence and care in the performance of its overhaul and maintenance responsibilities and shall meticulously follow the standards and procedures required by the Manufacturer (including all service bulletins) for overhaul and maintenance service.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents