Similar Projects
FCI Otisville - Medium Temperature Hot Water Line Replacement
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Otisville, NY 10963

2021 King Road East Water Main Extension Project
Alteration
Bidding
Ithaca, NY

Water and Wastewater Improvements
Alteration
Bidding
Greenville, NY

Lead Water Service Line Replacements
Term Contract
Post-Bid
Newburgh, NY 12550

Water Meters and Automatic Meter Reading System
Post-Bid
Malone, NY 12953

Shared Water Improvements
Results
Less than $115,000 est. value
Champlain, NY

North Utility Corridor Upgrade
Term Contract
Results
Lewiston, NY

Water Main Renewal Extensions and Improvements 2021
Infrastructure
Bidding
$168,000,000 est. value
Rochester, NY

Furnishing Water Materials for the Department of Public Utilities - 2020
Term Contract
Post-Bid
Troy, NY 12180

Holley Sidewalk Reconstruction and Waterline Improvements
Results
Less than $2,523,046 est. value
Holley, NY 14470

Furnish Onondaga Lake Marina and Yacht Club Water Line Replacement Project
Infrastructure
Bidding
NY

Water District No. 9 - Water Main Installation
Post-Bid
Albion, NY 14411

Interconnection Transmission Main at Rumbrook Pump Station
Results
Greenburgh, NY 10607

Valves-Pump Check Valves and Replacement Parts Dezurik
Term Contract
Bidding
NY

Waterline Replacement
Post-Bid
Grand Island, NY 14072

Last Updated 07/02/2021 09:24 AM
Project Title

Fort Plain Water System Improvements - Watermain Replacement

Physical Address View project details and contacts
City, State (County) Saint Johnsville, NY   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement and rerouting of existing watermain located along a creek near 510 County Highway 140, St. Johnsville NY including installing of approximately 865 LF of new 10 IN ductile iron water main, installing blow off piping and check valve, furnish and install one air relief valve and fault, abandoning in-place existing water main, including all associated temporary facilities, selective demolition, earthwork, site work, valves, fittings, disinfection and testing and site restoration.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents