Similar Projects
MMAC ANF-1 Replacement Chiller and Cool - Mike Monroney Aeronautical Center (Ward 3)
Renovation, Alteration
Conception
$1,420,000 est. value
Oklahoma City, OK 73169

Heat and Air Replacement at (5) Head Start Centers
Renovation
Design
$200,000 CJ est. value
Oklahoma City, OK 73102

36 New HVAC Systems to Be Installed
Renovation
Design
$400,000 CJ est. value
Talihina, OK 74574

HVAC Units, Parts, and Supplies
Term Contract
Sub-Bidding
Oklahoma City, OK 73102

Installation of 10 Central Heat Units
Alteration
Post-Bid

Installation of 10 Central Heat Units
Alteration
Post-Bid

Central Middle School - 2021 HVAC Renovation
Alteration
Results
Edmond, OK 73034

Drake Scroll Air-Cooled Chiller and Heat Exchanger Annual Preventative Maintenance at CIH
Term Contract
Results
Claremore, OK 74017

HVAC Mechanical Maintenance and Repair - Various Department of Public Safety (DPS) Locations
Term Contract
Post-Bid
$300,000 CJ est. value
Oklahoma City, OK 73049

Gym HVAC Replacement Project
Alteration
Results
Calumet, OK 73014

HVAC Operational Maintenance
Alteration
Post-Bid
$100,000 est. value
Oklahoma City, OK 73105

Green Country Technology Center Air Quality Improvements
Alteration
Results
Okmulgee, OK

Design and Install of a Cooling Tower for HVAC and Geothermal Systems
Alteration
Post-Bid
$500,000 est. value
Pawhuska, OK

Z2da--635 - Replace Prosthetics Dust Collector (Va-21-00080493)
Term Contract
Results
Oklahoma City, OK

V11H Series Commercial Cast Iron Boiler Repair
Renovation
Post-Bid
$57,000 CJ est. value
Oklahoma City, OK 73105

Last Updated 04/25/2023 03:09 AM
Project Title

NSU Fine Arts HVAC Boilers

Physical Address View project details and contacts
City, State (County) Tahlequah, OK 74464   (Cherokee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $41,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidders responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on best qualified bid. CONTRACT: Materials Work including but not limited to the following: 1) Supplying and delivering 6 Navien NFB-399C boilers

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents